Laserfiche WebLink
CITY OF ORONO1996 BID TABULATIONS FOR STREET MATERIALS & EQUIPMENT RENTAL <br />ALL QUANTITIES ARE BID IN TONS - EQUIPMENT IS BID PER HOURLY RATE <br />BACKHOE BACKHOE BACKHOE <br />PER HOUR PER HOUR PER HOUR <br />CY RATE CY RATE CY RATE <br />Schoening Excavating 1/2 55.00*3/4 65.00* <br />1 FBN Diversified 1.25 105.00* <br />3/4 TON PICKUP <br />W/8 PLOW PER HOUR <br />Schoening Excavating 8 ft plow 36.00/hr* <br />FBN Diversified 7.5 ft plow 50.00/hr <br />WHEEL LOADER <br />PER HOUR <br />WHEEL LOADER <br />PER HOUR <br />WHEEL LOADER <br />PER HOUR <br />CY R.vrn CY RATE CY RATE <br />Schoening Excavating 2 55.00*3 65.00* <br />FBN Diversified 1/2 55.00*3 75.00 <br />t <br />* Denotes low bid