My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-10-1997 Council Packet
Orono
>
City Council
>
1997
>
02-10-1997 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 2:49:19 PM
Creation date
7/31/2023 2:41:17 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br />1/1 Bonestroo <br />Rosene <br />Anderlik& <br />I Associates <br />Engineers & Architects <br />Bonestroo. Rosene. Anaerhk ^no Associates, tnc is <*n Affirmative Action Squint Opportunity Bmployer <br />Pnnop^fs Otto G Bonestroo. PE • Joseph C AnOe'iik. PE « V.urvm L Sorv^il*!. PE • <br />RiCh^rO E Turner. PE • Cienn R Cook. Pi • Thor^*^: E Noycs. PE • RoPert G Schunicnt. P£ • <br />Jerry A Bourdon. PE • Rooerc W Rosene. PE ^r.a Susan .vs Eoeriin. C PA.. Senior Consultants <br />Associate Principals Howard A Sanford. PE • Keitn a Gordon. PE • RoOert R Pfefferie. PE • <br />Ricnard W Foster. PE • Oavrd O Los^ota PE • RcPert C Russek. Al A • Mark A. Hanson. PE • <br />Michael T. Rautmann, PE • Ted K Field PE • Kenrern P. Anderson. P£ • Mark R, Rolfs. P£. • <br />Sidney P Williamson. PE L S • Robert F Kotsmitn <br />Offices St Paul Rochester Wiiimar and St Cioud VN • Mequon Wl <br />January 28, 1997 <br />City of Orono <br />P.O. Box 66. <br />Crystal Bay, MN 55323 <br />Itf- <br />^Otk <br />-rl nni^'rrsttm' <br />♦ <br />Attn: Greg Gappa <br />Director of Public Services <br />Re: Willow Drive <br />SAP 152-101-11 <br />Our File No. 13962 <br />Dear Greg: <br />Enclosed please find change order No. 2 for the Willow Drive Municipal State Aid <br />Improvements. This change order provides for additional common excavation and aggregate <br />shouldering material. Unsuitable material (muck and black dirt) was encountered beneath the <br />existing roadway and was removed and disposed. No soil borings were taken prior to <br />construction. It was assumed that the existing roadv/ay had been constructed on good material. <br />Change order No. 1 was added to the contract to overlay Willow Drive from the north end of <br />this project to CSAH 6. After the bituminous surface was placed it was necessary to place <br />shouldering material to protect the pavement edge. Cost associated with this work is refundable <br />by State Aid. <br />We recommend the City approve change order #2 in the amount of $8,940 <br />If you have any questions, please contact me. <br />Yoi ven <br />larlan M. Olson <br />HMO:gs <br />Enclosure <br />2335 West Highway 36 ■ St. Paul. MN 55113-3898 ■ 612-636-4600
The URL can be used to link to this page
Your browser does not support the video tag.