Laserfiche WebLink
street Reconstruction <br />PRELIMINARY COST ESTIMATE <br />ITEM <br />EST. UNIT <br />UNIT QUANTITY PRICE <br />Clearing and grubbing <br />Driveway restoration <br />Sawcut bituminous <br />Remove bituminous <br />Common excavation <br />Subgrade preparation <br />Cl. 5 aggregate base <br />Type 31 bituminous base course <br />Type 41 bituminous wear course <br />Bituminous material for tack <br />Silt fence <br />Sodding with topsoil <br />Seeding w/topsoil, mulch, fertilizer <br />Landscaping <br />Geotextile fabric <br />LS <br />SY <br />LF <br />SY <br />CY <br />SY <br />TN <br />TN <br />TN <br />GL <br />LF <br />SY <br />AC <br />LS <br />SY <br />1 <br />600 <br />250 <br />3.000 <br />1,100 <br />3,100 <br />1,500 <br />330 <br />250 <br />200 <br />900 <br />6.000 <br />0.40 <br />1 <br />3,100 <br />2,000.00 <br />15.00 <br />1.00 <br />2.00 <br />5.00 <br />1.00 <br />12.00 <br />29.00 <br />31.00 <br />2.00 <br />2.00 <br />2.00 <br />3.000. 00 <br />5.000. 00 <br />1.25 <br />Estimated Construction Cost <br />+5% contingencies <br />+15% design, inspection, admin <br />+5% capitalized interest & bonding <br />Total Estimated Cost <br />EST. <br />COST <br />2,000 <br />9.000 <br />250 <br />6.000 <br />5,500 <br />3,100 <br />18,000 <br />9,570 <br />7,750 <br />400 <br />1,800 <br />12,000 <br />1,200 <br />5,000 <br />3,875 <br />$85,445 <br />4,272 <br />$89,717 <br />13,458 <br />$103,175 <br />5,159 <br />$108,334 <br />13990APP.WB2