Laserfiche WebLink
BONESTROO AND ASSOCIATES ©612 6361311 02/06/97 14:02 0 :07/17 N0:654 <br />III. Sanitary Sewer <br />The proposed sanitary sewer for the Bay Ridge area is shown on Figure 2. From the review of the <br />project site, the route.s .shown on the figures are recommended from a construction standpoint. <br />The Bay Ridge area would be served by an 8" gravity sewer installed between the existing homes <br />and County Road IS (Shoreline E>rive). A lift station would be constructed approximately 250 feet <br />south of Bay Ridge near the intersection of the Hartwood private drive and County Road 15. This <br />location would allow for future .service to the Hartwood neighborhood. A 4“ forcemain would be <br />installed from the lift station north to County Road 31 (North Shore Drive). The forcemain would <br />be connected to an existing MCES forcemain on North Shore Drive. <br />An option to locate the sewer .sy.stem on Bay Ridge Road would not significantly change the cost of <br />the project. This option is not feasible due to property owner opposition. <br />Sewer service for each home would consi.st of u 4-inch PVC line. Services will be extended toward <br />each home a di.stance of approximately 20 feet from the wye. The property owners would be <br />responsible for the connection to the service. <br />The project will generally be con.'virucicd on private property. The alignment shown on Figure 2 will <br />require permanent and construction easements. <br />Detailed eost estimates for the sanitary sewer improvements are presented in the Appendices. <br />Sanitary Sewer Improvements .7 <br />4 <br />i