My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-16-1998 Planning Packet
Orono
>
Planning Commission
>
1998
>
11-16-1998 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2023 1:32:28 PM
Creation date
7/27/2023 1:25:12 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
375
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4. Utilities: The existing sanitary sewer and water main to serve this property are located within the right- <br />of-way for Navarre Lane. Plans and specifications should be prepared for the service line connections, <br />with as-built plans provided to the City upon completion. <br />5.Easements: Utility easements will need to be provided for the existing sanitary sewer, gas main and any <br />other existing utilities located in the abandoned portion of Navarre Lai^e. Drainage and utility easements <br />should be provided 5 feet wide along the perimeter lot lines and 10 feet wide along the County road right- <br />of-way. Drainage easements should be provided across all ponding areas. <br />6. Financial Guarantee: When the plans have been completed we will prepare an estimate of the total cost <br />for the site improvements to determine the amount of the financial guarantee required. <br />Please contact me at 604-4863 if you have any questions regarding this matter. <br />Yours very' truly. <br />BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC. <br />Tom Kellogg <br />cc: Greg Gappa, City of Orono <br />A <br />4
The URL can be used to link to this page
Your browser does not support the video tag.