My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-16-1998 Planning Packet
Orono
>
Planning Commission
>
1998
>
11-16-1998 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2023 1:32:28 PM
Creation date
7/27/2023 1:25:12 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
375
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1/I Bonestroo <br />Rosene <br />Anderlik & <br />I\J| Associates <br />Enginec rs & Architects <br />October 28. 1998 <br />Mr. Michael P. Gaffron, <br />Senior Planning Coordinator <br />City of Orono <br />Post Office Box 66 <br />Crystal Bay. Minnesota 55323 <br />Re: Told Development <br />File No. 139-2416 <br />3ones:rrc AncJfrhk ana Auccu^tet me is an Afhrmattvc Action Eiiuai Oppor:un-ty impioyer <br />Pnnc'pafs Otto G Bo.’^cstroo, PE • Joseph C AncJerlik PE • L S‘5rv.'*l^. PE • <br />Richjrd E Turner. PE • Gicrn R Cook. PE • Rot:crt G Schunicht. PE • Jerry A Boufu'on, PE • <br />Robert W Rosene PE Sus<<n M Eoenm. C PA Senior ConsuU<in(s <br />Associate Principals HovVtirj a S»in.*.jrcJ. PE • Ke«th A Gordon. PE • Robert R Pfeffe'ie. PE • <br />R.charc: W Foster. PE • O Loskct.». PE • Pob?ri C Putsck A I A • Mark A Hanson. PE • <br />f/icnaei T Rautrrann P£ • Ted K.Field. P.E • Kennem p Anderson P£ • Vark R. Rolfs. PE • <br />Sidney P Wii'-amson. PE . L S • Robert F Koismiin • Agnes V R.ng • W.cnaei P Rau, PE • • <br />Allan Rick Schmidt. PE. <br />Offices St Paul Rochester Wiiimar and Sf Cloud VN • ^/.lwaukee. Wi <br />W/tfbSite vvwvy bonestroo com <br />F <br />- .. <br />'Jn I <br />Dear Mike. <br />We have reviewed the site plan for the proposed commercial aeveloprncnt located on the east side of <br />Shadywood Road (CSAH 19). north of Navane Lane and Shoieliiie Drive (CSAH 15) in Navarre. The site <br />is proposed to be developed as a Walgteen ’s letail store. Them are several engineering issues that v'ili need <br />to be addressed as part of the plan review pfoce^s. <br />1. Traffic: The .site plan shows two accesses onto .Shadywood Road, one of which is located close to the <br />signalized intersection. Plans should be »ubimtled to Hennepin County lor their review and comment. The <br />proposed signing along CSAH 19 may creat.; sight restrictions for traffic leaving the site Details should <br />be provided for pylon signs and entrance monuments. <br />2. Grading: Design grades within the parking lot near the northerly access and just south of the proposed <br />building meet or exceed 5 percent and may create problems. We would recommend that access and <br />parking lot grades not exceed 4 percent. The proposed retaining wall is over 16 feet tall in some locations. <br />Retaining wall design and details should be provided tci review. Fencing will likely be required above <br />the wall along the pond for safety purposes. <br />3. Drainage: The existing NURP pond is not large enough to treat runoff from both the Walgreen site and <br />the existing Culvers site as stated in a November 29.1996 letter from the Minnebalia Creek V/atershed <br />District (MCWD). Assuming a pond normal water levei (NWL.) of 941.0. tlie proposed grading plan for <br />the Walgreen s site shows a reriuction in the existing pond’s wet volume from 0.6 acre feet to aoout 0.3 <br />acre feet. In order to meet MCNVD requirements it will be necessary to provide additional de.'uJ storage <br />in the pond. Options to provide the additional storage volume might include enlarging the existing pond, <br />installation of an underground storm water storage vault, or excavating additional pond volume in the <br />existing wetland located just west of the ponding area. It should be noted that the existing wetland does <br />fall under MN DNR jurisdiction and mitigation would likely be required. A method of reducing the total <br />volume of storm water that needs to be treated nvight be to divert rooftop drainage from one or both <br />buildings away fixjm any on-s'te treatment facilities. Technica! data indicates that the qualify of looftop <br />drainage is cIo:>e to that of runoft from cpci: land v ;th respect to tciai suspended solids (TSS) and total <br />phosphorous (TP) and that additional treatment not cost effective. Drainage calculations, po.nd <br />calculations atid a draine.ge area inap shv'xdd be submitted for review. Based on the dramagn <br />calculations, it may be necessary to expand ti;c proposed storm sev'er system to include additional catch <br />basins. Final plans should be submitted to the MCWD .for theii review and approval. <br />2335 West Highway 36 • St. Paul, MN 55113 ■ 612-636-4600 ■ Fax: 612-636-1311
The URL can be used to link to this page
Your browser does not support the video tag.