Laserfiche WebLink
"2439 Ser^'lce 800, Inc <br />November 12,1998 <br />Page 5 <br />D. <br />6. <br />The landscaping plan includes 5 trees across the Highway 12 frontage, I tree at the right rear <br />comer, and a row of shrubbery along the east side of the building. Applicants plans should <br />more clearly specify which spaces along the building perimeter will be green spaces, and the <br />types of ground cover specified (grass vs. landscape rock. etc.). The B-1 District standards <br />do not set specific green space requirements. Green space constitutes approximately 25% <br />or 34% of the site depending on the parking scheme, as follows: <br />Full Parking Development (45) <br />25% green space <br />26% building footprint <br />49% parking and sidewalks <br />Initial Proposed Parking (361 <br />34% green space <br />26% building footprint <br />40% parking and sidewalks <br />With the apparent proposed grade change between this site and the Wear shopping center <br />next door, coupled with the parking being as near as 3' to the lot line, there is little <br />opportunity for any significant landscaping between the two sites. <br />The issue of parking lot setbacks is of some concern. Note that the existing sidewalk <br />is completely within the right-of-way of Highway 12 (constmcted at the shoulder) and leaves <br />15'-30' of green r.o.w. between the front lot line and the sidewalk, enhancing the appearance <br />of open space. This results in a visual green space between Highway 12 and the proposed <br />parking lot of from 20' to 70’ in depth. It is unknown to staff whether future upgrades of <br />Highway 12 will make use of this space. The 20' front yard requirement is met on average, <br />although portions of the parking lot encroach into that 20'. This is due to the shape of the lot, <br />and may constituie an adequate hardship for the variance. <br />There is no side vard requirement for B-1, hence parking is allowed to within 3' of the side <br />lot line under staffs interpretation of Sections 10.40 Subd. 6 and 10.61 Subd. 5B. It could <br />be argued that the triangular MnDOT property at the southwest comer of the site is a side <br />street, however, and it is possible that future access to the adjacent Otten site will be from <br />this location. In this case, there should be a 10' setback from the west lot line to the first <br />parking stall. This would also have an impact on building setback requirements; setback from <br />a side street is required to be 35’, and the building is only 15’ from the lot line at this comer. <br />However, it may be a stretch to say that this expanded MnDOT right-of-way is a street for <br />setback purposes, and staff does not view this as a variance situation. <br />Parking at the rear of the property is conforming in location, being 3' + from the rear lot line <br />and 10’ + from the R-1A boundar\'. However, see the comments in item #1 above. <br />Snow storage is likely to become an issue if the parking lot is fiilly used for parking. There <br />is little area on the site that could be used for snow storage.