Laserfiche WebLink
#2425 - Rebers Subdivision <br />October 15,1998 <br />Page 2 <br />required that future development of Outlots E and F be accessed by the service road rather than <br />directly to Highway 12. <br />The 1997 discussions revolved around whether, when and how the service road will be built, and <br />whether Outlot E can be developed without the service road being constructed. The final outcome <br />after a lengthy process of review and discussions with the developer and his representatives at both <br />staff and Council levels, was that Outlot E could be converted to a buildable site (becoming "Lot 1, <br />Sugar Woods 2nd Addition") subject to a number of conditions spelled out in Resolution No. 3972, <br />including: <br />- Lot 1 can access directly to Highway 12 at a site directly across from Brimhall Avenune, <br />subject to MnDOT approval. <br />- Right-in/right-out access to Lot 1 from Highway 12 is approved permanently; left-in <br />/left-out access to 12 at Brimhall is acceptable on interim basis; when frontage road is <br />installed. City reserves the right to terminate right-ia'right-out with compensation to <br />property owner, can terminate left-in/left-out without compensation; as long as Hwy 12 <br />accesses of other properties served by frontage road are similarly terminated. <br />- City has right to control access to Lot 1 thru Wear site via commercial site plan review <br />process (i.e. City can prohibit or allow such access). <br />- Lot 1 will bear the costs of frontage road construction adjacent to Lot 1. Owner can <br />contest the necessity and feasibility of such a road at the time it is proposed. City will <br />require financial security for future road construction at final platting. <br />- City to end up with road/trail/drainage/utility easements over old Outlot D and over the <br />new triangular segment of corridor being platted as Outlot A. <br />Resolution No. 3972 contains a number of findings which support the final conditions of approval. <br />Stormwater Plan <br />An additional condition of Resolution No. 3972 was that applicant confirm that the existing <br />stormwater pond in Outlot F is viable to serve Lot 1, or provide a new stormwater plan for Lot 1 and <br />Outlot F. As of this writing, no confirmation or plan has been submitted; however, the contract <br />between Rebers and his purchaser requires the purchaser to complete the final plat requirements, <br />which suggests that stormwater will be dealt with as part of the Commercial Site Plan Review...