My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-19-1998 Planning Packet
Orono
>
Planning Commission
>
1998
>
10-19-1998 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2023 1:31:38 PM
Creation date
7/27/2023 1:23:09 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
436
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
#2425 - Rebers Subdivision <br />October 15,1998 <br />Page 2 <br />required that future development of Outlots E and F be accessed by the service road rather than <br />directly to Highway 12. <br />The 1997 discussions revolved around whether, when and how the service road will be built, and <br />whether Outlot E can be developed without the service road being constructed. The final outcome <br />after a lengthy process of review and discussions with the developer and his representatives at both <br />staff and Council levels, was that Outlot E could be converted to a buildable site (becoming "Lot 1, <br />Sugar Woods 2nd Addition") subject to a number of conditions spelled out in Resolution No. 3972, <br />including: <br />- Lot 1 can access directly to Highway 12 at a site directly across from Brimhall Avenune, <br />subject to MnDOT approval. <br />- Right-in/right-out access to Lot 1 from Highway 12 is approved permanently; left-in <br />/left-out access to 12 at Brimhall is acceptable on interim basis; when frontage road is <br />installed. City reserves the right to terminate right-ia'right-out with compensation to <br />property owner, can terminate left-in/left-out without compensation; as long as Hwy 12 <br />accesses of other properties served by frontage road are similarly terminated. <br />- City has right to control access to Lot 1 thru Wear site via commercial site plan review <br />process (i.e. City can prohibit or allow such access). <br />- Lot 1 will bear the costs of frontage road construction adjacent to Lot 1. Owner can <br />contest the necessity and feasibility of such a road at the time it is proposed. City will <br />require financial security for future road construction at final platting. <br />- City to end up with road/trail/drainage/utility easements over old Outlot D and over the <br />new triangular segment of corridor being platted as Outlot A. <br />Resolution No. 3972 contains a number of findings which support the final conditions of approval. <br />Stormwater Plan <br />An additional condition of Resolution No. 3972 was that applicant confirm that the existing <br />stormwater pond in Outlot F is viable to serve Lot 1, or provide a new stormwater plan for Lot 1 and <br />Outlot F. As of this writing, no confirmation or plan has been submitted; however, the contract <br />between Rebers and his purchaser requires the purchaser to complete the final plat requirements, <br />which suggests that stormwater will be dealt with as part of the Commercial Site Plan Review...
The URL can be used to link to this page
Your browser does not support the video tag.