My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-18-1998 Planning Packet
Orono
>
Planning Commission
>
1998
>
05-18-1998 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2023 1:22:48 PM
Creation date
7/27/2023 1:12:25 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
459
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ANALYSIS <br />Lot Area and Yards <br />Rl-B District Standards <br />Lot Area Lot Width Street Yard Side Yard Lakeside <br />.5 acre 100’30'10'30' <br />Subject Property Lot Area and Yards <br />Lot Area Lot Width Street Yard Side Yard Rear <br />.53 acres 105'34.3'14' existing <br />8' proposed <br />140' to house <br />The lot meets lot area and lot width requirements. The addition requires a side yard variance to <br />encroach 2' into the required yard. <br />Structural Coverage <br />Total Lot Size Total Structural Coverage Allowed Total Structural Coverage <br />Proposed <br />23,100 sq. ft.3,465 sq. ft. <br />(15%) <br />2,238.06 sq. ft. <br />(9.6%) <br />The proposed addition complies with lot coverage requirements. <br />STATEMENT OF HARDSHIP <br />i <br />The applicant has indicated that the master bedroom is 10' x 10'. The house is a walkout rambler. <br />The applicant desires to expand the bedroom northward. An expansion to the east would require <br />building into the walkout area. <br />U2367 Lawrence Gleason <br />NO Hackberry Hill <br />DateofP.C. May 18, 1998 <br />page~2
The URL can be used to link to this page
Your browser does not support the video tag.