My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-18-1998 Planning Packet
Orono
>
Planning Commission
>
1998
>
05-18-1998 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2023 1:22:48 PM
Creation date
7/27/2023 1:12:25 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
459
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
F <br />TO:Michael P.Gaffron, Senior Planning Coordinator <br />FROM;Stephen Weckman On-Site Systems Manager <br />DATE:May 13,1998 <br />SUBJECT: Septic Review for Application #2372, Barry Haglund - Subdivision <br />The proposed two lot subdivision requires the use of on-site sewage treatment systems. Soil borings <br />and percolation tests were performed by S-P Testing, Inc. to identify primary and alternate drainfield <br />sites on each lot. The information provided indicates that all drainfield sites meet all Orono standards <br />for design and location. The primary drainfield site for lot 1 meets a 20 foot setback to the existing <br />East property line. Should the road right of way be widened, the function of the drainfield site wiU <br />not be effected and would still meet the minimum State standards. <br />Based on the above information, staff recommends approval of the subdivision. The City requires <br />the drainfield sites to be fenced off prior to any grading or land alteration. <br />■ <br />: <br />r <br />i
The URL can be used to link to this page
Your browser does not support the video tag.