Laserfiche WebLink
F <br />TO:Michael P.Gaffron, Senior Planning Coordinator <br />FROM;Stephen Weckman On-Site Systems Manager <br />DATE:May 13,1998 <br />SUBJECT: Septic Review for Application #2372, Barry Haglund - Subdivision <br />The proposed two lot subdivision requires the use of on-site sewage treatment systems. Soil borings <br />and percolation tests were performed by S-P Testing, Inc. to identify primary and alternate drainfield <br />sites on each lot. The information provided indicates that all drainfield sites meet all Orono standards <br />for design and location. The primary drainfield site for lot 1 meets a 20 foot setback to the existing <br />East property line. Should the road right of way be widened, the function of the drainfield site wiU <br />not be effected and would still meet the minimum State standards. <br />Based on the above information, staff recommends approval of the subdivision. The City requires <br />the drainfield sites to be fenced off prior to any grading or land alteration. <br />■ <br />: <br />r <br />i