My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-20-1998 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1990-1999
>
1998
>
04-20-1998 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2023 1:14:18 PM
Creation date
7/27/2023 1:06:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File #2340 <br />March 13, 1998 <br />Page 5 <br />3.The Orono Trail System Plan includes a corridor along North Shore Drive. The Park <br />Commission reviewed this plat on February 2 and recommended a cash dedication, noting <br />that it appears sufficient right-of-way exists for any future trails along the County Road. <br />Riparian Access Issue <br />(See discussion in the Februar>' 12 memo) Only the lakeshore lot will have legal riparian access <br />under City ordinances. <br />Stormwater Ponding <br />The preliminary drainage and grading plan was received late on March 12 and has yet to be reviewed <br />by the City engineer. <br />The City normally e.xcludes the area of required stormwater ponding from the area calculation of <br />individual lots, per Subdivision Code Section 11.41, Subdivision B (4). When the 35' x 55* pond <br />is excluded, the area of Lot 1 is ver>' slightly under 0.75 acre. The City normally excludes <br />stormwater ponds from calculable lot acreage. However, the City did allow wetland acreage to be <br />used for the 'extra 50%' acreage requirement for unsewered back lots in the Old Cr>'stal Bay Road <br />Addition. Does Planning Commission feel that the goals of the back lot ordinance are met by <br />crediting stomi pond acreage toward the excess 50% area? <br />Issues for Discussion <br />1.Does Planning Commission support the concept that the lot line abutting the private road <br />outlot, Outlot A, can be the front lot line, thereby making Lot 2 a conforming duplex lot? If <br />not, will Planning Commission grant a lot width variance for the duplex lot? <br />2.Will Planning Commission in favor of establishing a policy that stormwater ponding can be ^ <br />credited toward the 'extra 50% area' required for a back lot? ^ <br />3.Does Planning Commission concur that applicant should be responsible for constructing a <br />24' paved road the entire length of Outlot A, and granting easements over such road to all <br />propertj’ owners that will make use of it? Does Planning Commission agree that this should <br />be a private road, and not public? OK- <br />4.Will Planning Commission recon.mend approval of the width and length variances <br />associated with Outlets A and B? <br />i
The URL can be used to link to this page
Your browser does not support the video tag.