Laserfiche WebLink
BONESTROO AND ASSOCIATES ^612 6361311 02/12/98 12:59 0 :04/04 N0:957 <br />CITY OF ORONO <br />LITTLE ORCHARD <br />RESIDENTIAL SITE DEVELOPMENT <br />PL^T FILE NO. 2341 <br />SITE IMPROVEMENT COST ESTIMATE <br />feST.UNIT EST. <br />ITEM UNIT QUANTITY PRICE COSTMobilizationLS1$5,000.00 $5,000Site grading LS 1 10.000.00 10,000 <br />Common Excavation CY 1200 6.00 7,200Aggregate base. Cl. 5, 100% crushed TN 1800 10.00 18,000Type 31 bit. base course TN 250 32.00 8,000Type 41 bit. wear course TN 200 35.00 7,000 <br />Surmountable concrete curb and gutter LF 1350 6.00 8,10018" CMP culvert LF 60 18.00 90018" CMP F.E.S.EA 2 150.00 300Silt fence LF 1500 3.00 4,500 <br />Seeding with 4" topsoil AC 1.5 3.000.00 4,500Sod with 4” topsoil SY 1600 3.00 4,800Estimated Construction Cost <br />+50% Security Deposit <br />Total Security Deposit Required <br />$78,300 <br />39.150 <br />$117,450 <br />234Hittleorchard.xls