My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-17-1998 Planning Packet
Orono
>
Planning Commission
>
1998
>
02-17-1998 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2023 1:14:04 PM
Creation date
7/27/2023 1:05:22 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON JANUARY 20,1998 <br />Septic sites have been tested. There is limited building flexibility, especially for Lot 6. <br />Steve Weckman has reviewed the sites and is concerned that the 6% slope is not being <br />met. More mound systems may be necessary and additional review required. The bluff <br />affects 3 of 4 lakeshore lots. <br />Gaffron indicated that the tree line follows the shoreline presenting pristine views from <br />the bay, which should be preserved. He is concerned with building a corridor to the lake <br />and suggests some limitations witliin the corridor to ensure that trees are not cut down to <br />the lake. He suggested a tree conservation easement. <br />Gaffron said a trail corridor is laid out for the west side of Old Crystal Bay Road. <br />Hennepin Parks has a long term intent for a trail system connecting the Luce Line to <br />Noerenberg. Difficulty in continuing the east side trail is due to topography problems <br />and preference has been shown for the trail continuation on the west side of the road. The <br />subdivision will be subject to park dedication, whether by fee or land. <br />s, <br />kt
The URL can be used to link to this page
Your browser does not support the video tag.