My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-17-1998 Planning Packet
Orono
>
Planning Commission
>
1998
>
02-17-1998 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2023 1:14:04 PM
Creation date
7/27/2023 1:05:22 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON JANUARY 20,1998 <br />bluff located on 3 of 4 lots forces the setback to an average 150 ’, where normally the <br />setback is 75'. <br />Gaffron indicated the issues for discussion include access, lot area/width standards, on <br />site sewage treatment, bluff impacts, tree preservation, park dedication, archaeological <br />sites, wetlands, and stormwater drainage. Gaffron said the code would generally limit <br />individual access to major roadways. A change will be necessary for access to Lot 8, <br />possibly by an outlot road. Hennepin County will also need to review access. Gaffron <br />said the best plan w'ould be for all lots to access from one road, but with circumstances <br />being as they are, two roads would make sense. <br />Gaffron reported that the lots meet the 2 acre zoning. Lot 3 does not meet the 200' width <br />requirement. The four lakeshore lots are narrow, and the angle of the existing property <br />boundaries with the shoreline makes it difficult to lay out the lots. The setbacks are 50' <br />front, 30' side, 50' rear, and 75' setback from the bluff.
The URL can be used to link to this page
Your browser does not support the video tag.