My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-10-2023 Council Packet
Orono
>
City Council
>
2023
>
07-10-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2023 2:27:31 PM
Creation date
7/25/2023 2:20:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM <br /> <br />Prepared By: Reviewed By: AMC Approved By:RJO <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1. Purpose. The purpose of this action item is to award the Tonkawa-Partenwood Forcemain <br />Replacement Project. <br /> <br />2. Background. In January of 2022 Council approved the design of the Tonkawa Force Main <br />replacement project. During the design process we determined a large portion of the initial projected area <br />did not need to be replaced. This provides a funding opportunity to incorporate the adjoining Partenwood <br />force main into the replacement project without increasing the overall construction budget. This is <br />especially timely as Partenwood road is slated for pavement replacement in 2024. Completing the force <br />main replacement in 2023 will ensure the new pavement in 2024 will not be impacted. In June the council <br />approved the change in scope of the project. The design was amended and bids have been received. <br /> <br />3. Scope. The project includes the replacement of 1630 feet of Sanitary Forcemain along Tonkawa <br />Road and 1500 feet of forcemain along Partenwood Road. (Exhibit A) <br /> <br />4. Cost. The city received proposals from 4 contractors (Exhibit B). The low quote was for $ 738,847.00 <br />from Bituminous Roadways. In addition to the construction cost, Bolton and Menk provided a proposal <br />of NTE $102,500.00 for construction oversight. (Exhibit C) <br /> <br />Who Work Cost Status <br />Bolton &Menk, Inc Design and Engineering $ 73,000.00 Not to exceed, previously approved <br />Bituminous Roadways <br />Inc. <br />Construction $ 738,847.00 Pending award <br />Bolton &Menk, Inc Construction Oversight $ 102,500.00 Not to exceed <br />Total $914,347.00 <br /> <br />5. Funding. The forcemain replacement project will be funded by a combination of the sanitary sewer <br />fund and ARPA funding. The projected 2023 year-end balance for the Sewer Fund is $1,176,080. <br /> <br />6. Staff Recommendation. I recommend council award the project. <br /> <br />COUNCIL ACTION REQUESTED <br />Motion to award the Tonkawa-Partenwood Forcemain Replacement Project to Bituminous Roadways Inc. <br />for $ 738,847.00 and to authorize Bolton and Menk to perform design and construction oversight for a fee <br />not to exceed $102,500. <br /> <br />Exhibits <br />A. Project Map <br />B. Bid Summary <br />C. Bolton and Menk Proposal. <br /> <br /> <br />Item No.: 7 Date: July 10, 2023 <br />Item Description: Approval of Tonkawa-Partenwood Forcemain Replacement Award <br />(22-021) <br />Presenter: Adam T. Edwards <br />City Administrator/City Engineer <br />Agenda <br />Section: <br />Consent
The URL can be used to link to this page
Your browser does not support the video tag.