Laserfiche WebLink
<br /> <br />1795 St. Clair Avenue <br />St. Paul, MN 55105 <br />(651) 696-5186 <br />www.oertelarchitects.com <br />Monitoring plates for area west of the building identified for soil correction. Required to monitor settlement within <br />the building limits. Once settlement reached acceptable limits, building construction could continue. <br /> <br />Recommend approval <br /> <br />PR#09 – Stormwater Changes <br /> <br />Grading and utility changes to the east storm drainage pond. The lengths of pipe shown on the drawings did not <br />match the contours that were shown on the grading plan. <br /> <br />Recommend approval <br /> <br />PR#10 – Storage Bins <br /> <br />Construction of partial concrete wall (easternmost wall of north storage bin bid alternate) for mounting of control <br />panel and venting for the force main. <br /> <br />Recommend approval <br /> <br />PR#11 – Drainage Pond Revisions <br /> <br />Changes to piping, silt fence, and removals at the southwest corner of the storm water pond. The extra required <br />removals and additional erosion control were not in the bid. <br /> <br />Recommend approval <br /> <br />GC#01 – Overhead Stops <br /> <br />Additional overhead stops for the overhead crane <br /> <br />Recommend approval <br /> <br />GC#02 – Northwest Parking Lot Soil Corrections <br /> <br />Soil corrections required to meet project requirements. Unforeseen conditions observed and directed by AET. <br /> <br />Recommend approval <br /> <br />GC#03 – East Parking Lot Soil Corrections <br /> <br />Soil corrections required to meet project requirements. Unforeseen conditions observed and directed by AET. <br /> <br /> <br />Recommend approval <br /> <br />GC#04 – Water Main Excavation <br /> <br />The water service was much deeper than indicated on plans and as-built drawings. This required additional and more <br />complicated excavation time and strategies <br />