My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-24-2023 Council Packet
Orono
>
City Council
>
2023
>
07-24-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2023 2:19:49 PM
Creation date
7/25/2023 2:17:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MAPLE GROVE <br />FIRE STATION <br />EXPANSION <br />Throughout the 2,850 square foot addition, Oertel <br />Architects employed a sympathetic and cohesive design, <br />matching new materials, scale, and details to the existing <br />structure for an even flow throughout the building. We <br />designed a new drive-thru bay to house a new 100-foot <br />ladder truck. Additions included a turn-out gear area, 730 <br />square foot mezzanine storage, a hose tower and a training <br />balcony. <br />As is common in our projects, particularly for additions <br />where the original space is still in use, the team was <br />able to ensure that the existing fire station remained <br />operational throughout the entire construction process. <br />CONTACT <br />Tim Bush, Fire Chief/ Emergency Manager <br />e: tbush@maplegrovemn.gov <br />p: (763) 494-6301 <br />PROPOSAL FOR ARCHITECTURAL & ENGINEERING SERVICES- ORONO FIRE STATION OERTEL ARCHITECTS- 6
The URL can be used to link to this page
Your browser does not support the video tag.