My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-24-2023 Council Packet
Orono
>
City Council
>
2023
>
07-24-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2023 2:19:49 PM
Creation date
7/25/2023 2:17:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
does not meet those requirements on either side. <br />They already have a bowed wall- and we have hardly had any rain: <br />There doesn’t appear to be enough weeps. There is no drainage designed. The drain that is on <br />the drawings is at the top of the hill on grade. <br />Also, no handrails are shown on the drawings. They are required any time there is a 30” height <br />difference in accessible areas. They need to be 42” high and have 4” max spacing for <br />horizontal rails. <br />If there is granular fill backing the retaining walls as there should be, plantings shown will not <br />flourish nor even survive. <br />They continue to go around the ordinances to expand and use “after the fact” as if they have <br />no choice. Please don’t let them get away with this. It’s a ploy and their response is as a <br />spoiled child. Besides that, preservation, conservation and restoration are more in character <br />of the lake. <br />Thank you, <br />Penny Saiki <br />2874 Casco Point Road <br />psaiki@icloud <br />952-237-6753 <br />L I V E W E L L
The URL can be used to link to this page
Your browser does not support the video tag.