My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-17-2023 Planning Commission Packet
Orono
>
Planning Commission
>
2023
>
07-17-2023 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2023 9:52:21 AM
Creation date
7/17/2023 1:49:35 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FILE # LA23-000005 <br />July 17, 2023 <br />Page 3 of 4 <br />(5) Structures must be elevated on fill or structurally dry floodproofed in accordance with the <br />FP1 or FP2 floodproofing classifications in the state building code. All floodproofed <br />structures must be adequately anchored to prevent flotation, collapse or lateral <br />movement and designed to equalize hydrostatic flood forces on exterior walls. <br />(6) As an alternative, an accessory structure may be internally/wet floodproofed to the FP3 or <br />FP4 floodproofing classifications in the state building code, provided the accessory <br />structure constitutes a minimal investment and does not exceed 576 square feet in size. <br />Designs for meeting this requirement must either be certified by a registered professional <br />engineer or meet or exceed the following criteria: <br />a. To allow for the equalization of hydrostatic pressure, there must be a minimum of <br />two "automatic" openings in the outside walls of the structure, with a total net area <br />of not less than one square inch for every square foot of enclosed area subject to <br />flooding; and <br />b. There must be openings on at least two sides of the structure and the bottom of all <br />openings must be no higher than one foot above the lowest adjacent grade to the <br />structure. Using human intervention to open a garage door prior to flooding will not <br />satisfy this requirement for automatic openings. <br />(d) Structural works for flood control that will change the course, current or cross section of <br />protected wetlands or public waters are subject to the provisions of Minn. Stat. § 103G.245. <br />(e) A levee, dike or floodwall constructed in the floodway must not cause an increase to the one <br />percent chance or regional flood. The technical analysis must assume equal conveyance or <br />storage loss on both sides of a stream. <br />(f) Floodway developments must not adversely affect the hydraulic capacity of the channel and <br />adjoining floodplain of any tributary watercourse or drainage system. <br />A CUP may be granted subject to such conditions as the Council may prescribe. Additionally, a <br />CUP shall remain in effect as long as the conditions imposed by the City Council are observed, but <br />nothing in this section shall prevent the city from enacting or amending official controls to change <br />the status of conditional uses. <br />Conditional Use Permit Analysis <br />The proposed seawall meets the requirements of the City floodplain regulations. The proposal will <br />also be required to obtain all necessary permits from the appropriate agencies MCWD and LMCD <br />regarding the project. <br />There are no specific Building Code construction standards for seawalls and will rely on an <br />engineered design. The City will require that a building permit be issued to document the <br />construction of the seawall. <br />The City's primary concern regarding this project is the access to the seawall and the construction of <br />it. The seawall is adjacent to City -owned property, Lydiard Beach. The construction of the proposed <br />seawall will require access through and staging on City owned property. The City will require a <br />temporary encroachment agreement to be executed by the applicant and the City for the construction <br />of the project. As part of the permit, the City will require that any damage to Lydiard Beach during the <br />construction process be mitigated and repaired. Further, the City will stipulate that the entire project <br />take no more than 30 days to complete. The applicant has acknowledged this requirement and <br />confirmed that the project will be completed in that timeline. <br />
The URL can be used to link to this page
Your browser does not support the video tag.