My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-12-2023 Council Packet
Orono
>
City Council
>
2023
>
06-12-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2023 1:49:04 PM
Creation date
6/27/2023 1:45:10 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM <br /> <br />Prepared By: Reviewed By: AMC Approved By: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1. Purpose. The purpose of this action item is to gain council approval to commence the planning and <br />engineering of the 2024 Street Improvement Project. <br /> <br />2. Background. At the May 8th, 2023 Council Work Session, the Council provided direction for 2024 <br />street projects. The streets being considered for 2024 are Willow Drive South (Fox to Brown), <br />Partenwood Road & Lane, and Orchard Park Road (as an alternate). <br /> <br />3. Scope. Planning and engineering will consist of topographic surveying, utility inspections, design, <br />permitting, public input and solicitation of bids for select roads. <br /> <br />4. Engineering and Design Cost. Bolton and Menk has provided a scope of services for a fee estimate <br />not to exceed $55,000 (Exhibit A). <br /> <br />5. Funding. The engineering as well as the eventual projects will be funded with a combination of the <br />Pavement Management and Stormwater Fund. <br /> <br />Fund Cost Estimate Est. 2023 End of Year Fund Balance <br />Pavement Fund $ 1,121,500 $ 369,906 <br />Stormwater Fund $ 184,680 $ 1,838,546 <br />Total $1,306,180 <br /> <br />6. Timeline. The following is a preliminary timeline for the project. <br /> <br />When Activity <br />June-September 2023 Preliminary Design <br />October-January 2024 Final Design and Bid Packet Prep <br />February 2024 Bid Solicitation <br />March 2024 Award <br />June-October 2024 Construction Window <br />June-July 2025 Punch list and Project close out. <br /> <br />COUNCIL ACTION REQUESTED: <br />Move to direct the City Engineer to move forward with preliminary planning for the 2024 Street <br />maintenance project and acceptance of the Bolton and Menk’s proposal for preliminary design. <br /> <br />Exhibits <br />A. Bolton and Menk Proposal <br />Item No.: 18 Date: June 12, 2023 <br />Item Description: Street Improvement Project Planning and Engineering <br />(Project #24-001) <br />Presenter: Adam T. Edwards <br />City Administrator/City Engineer <br />Agenda <br />Section: <br />Consent Agenda
The URL can be used to link to this page
Your browser does not support the video tag.