Laserfiche WebLink
13.Page 7 <br />Drtunity for good <br />be looked into <br />drainage plan for <br />jgested that the <br />lication on the <br />I the application <br />he project seems <br />5 are capable of <br />ver studies are <br />ig Commission can <br />arly the public <br />Nays (0). <br />I the cer ti f icate <br />)lication. Bill <br />from the audience <br />was the access <br />an for 13 lots <br />tiding collector <br />with some shared <br />ny lots gaining <br />ctor roads. He <br />Willow and Old <br />t than they do now <br />ng for that now, <br />tsses should gain <br />new cul de sac. <br />:eat deal of time <br />i stated that the <br />ind a half, and i f <br />d cost him more. <br />stated that the <br />Id handle the <br />p from this plat. <br />his concern with <br />e is a blocked <br />raised the water <br />homes <br />Page 8 <br />No second. Motion failed. <br />orthos "pla\^ aonr^phase II <br />Prope^y^and th'a'r^he"^ t^°e ™r" <br />developing the rest then*^^hA <br />subdlvLiln. a whole new <br />; s.i£r€"VH ‘"Hr,v ~ ri <br />sr' <br />1. <br />retention ponds, etc. drainageways, <br />2. <br />3. <br />buildability of a <br />sustain an on-sitrseX"*°;;/t?;;" " <br />5«‘>‘>-00. each lot at <br />4. <br />const^rucUon.'^" ""^ineer prior to <br />5. <br />6. <br />7. <br />issue <br />rol^d ¥o?^an°y^ ^litufe-d^v'^Al-”^ <br />conector*^'’?oadr cannot ac^*" surrounding <br />cuts, then application these curb <br />Commission for another revi^eT" <br />8. Private road to meet all city standards. <br />Sime seconded. Vote: Ayes (4), Nays (1). <br />um ■. . . -; .* ■ <br />//;t*ES OF 1 <br />AKE MINNETO <br />(CONT.) <br />#695 GUENTHE <br />1428 BALDUR <br />VARIANCE <br />#760 WILLIAM <br />1535 BOHNS I <br />CONDITIONAL