Laserfiche WebLink
f0,51 „,10 CITY OF ORONO <br /> RESOLUTION OF THE CITY COUNCIL <br /> No.7365 <br /> t�kES H©¢� <br /> A. Park Dedication Fee. The subdivision is subject to the standard Park Dedication Fee <br /> requirement. The Park Dedication Fee is outlined in the City's current 2023 Fee Schedule <br /> and applied to each newly created lot on a per lot basis. Park dedication fees are based on <br /> Hennepin County's assessment of the predeveloped land value. Based on the 2023 Fee <br /> Schedule,the Park Dedication Fee will be due for Lot 2 in the amount of$136,302.52. <br /> B. Stormwater and Drainage Trunk Fee. The development is subject to the Stormwater and <br /> Drainage Trunk Fee, as established in the 2023 Fee Schedule of$5,250 per new lot for the <br /> 1-acre zone. The Storm Water Drainage and Trunk Fee due at the time of Final Plat for 1 <br /> new lot will be$5,250.00. <br /> C. Utility connection fees as described above. Sewer connection charge will be due for Lot <br /> 2 prior to Final Plat approval in the amount of$5800.00 <br /> 11) City Engineer Approval. Approval of the plat is subject to recommendations of City <br /> Engineer Adam Edwards. <br /> 12) Plans and Specifications. The following plans and specifications shall be submitted for <br /> review and approval by the City and other appropriate jurisdictions prior to final plat <br /> approval,to ensure that the proposed plat will accomplish the intended purposes: <br /> (a) Final conceptual grading, drainage and erosion control plan for the proposed <br /> shared driveway, showing existing and proposed contours; any proposed <br /> stormwater facilities and calculations as required by the Minnehaha Creek <br /> Watershed District;proposed utility connections; and erosion control measures <br /> to be used during demolition and construction. Final Plat Approval will not be <br /> granted until the Minnehaha Creek Watershed District has approved the <br /> stormwater management plans. <br /> (b) Final plans and specifications for all proposed utility lines and services, <br /> including proposed revisions, if any,to existing service facilities. <br /> (b) Sufficient detail to meet the recommendations of the City Engineer. <br /> 13) The Preliminary Plat approval granted by this Resolution shall expire one-year from the <br /> approval date(May 8,2024). <br /> FINAL SUBMITTALS <br />