My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-08-2023 Council Packet
Orono
>
City Council
>
2023
>
05-08-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2023 12:08:41 PM
Creation date
5/9/2023 12:01:24 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
334
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM <br /> <br />Prepared By: Reviewed By: A. Carlson Approved By: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> 1. Purpose. The purpose of this action item is to award the contract for the 2023 Street Maintenance <br />Project (23-001). <br /> <br />2. Background. At the April 10th, 2022 Council Work Session, the Council provided direction for 2023 <br />street projects. The streets identified for 2023 are Fox Street (Brown to Orono Orchard) and Townline <br />Road. Townline Road is being resurfaced as a joint project with Independence and Medina. Staff <br />received bids for the Fox street project on May 3rd. <br /> <br />3. Scope of Work. The project consists of the reclamation and mill and overlay of the bituminous <br />pavement, select subgrade corrections, and the replacement / improvement of the associated stormwater <br />systems for Fox Street between Orono Orchard Road and Brown Road. <br /> <br />4. Cost. The city received seven bids. The Bid Summary is at Exhibit A. The low bid for $268,261 is <br />from Bituminous Roadways. In addition to the construction cost, Bolton and Menk provided a proposal of <br />NTE $35,000 for construction oversight. (Exhibit B) <br /> <br />Who Work Cost Status <br />Bolton &Menk 2023 Streets Design and Bid <br />Engineering <br />$62,300.00 Previously approved <br />Astech Corp Construction $268,261 Pending award <br />Bolton &Menk Construction Oversight $35,000.00 Not to exceed <br />TOTAL $365,561.00 <br /> <br />5. Funding. Funding for the project will come from a combination of the pavement management fund, <br />stormwater fund, water fund, and sewer fund. <br /> <br />Fund As bid Est. 2023 End of Year Fund Balance <br />Pavement Fund $359,705.00 $417,106 <br />Stormwater Fund $5856.00 $1,838,546 <br />Total $1,009,287.40 <br /> <br />6. Staff Recommendation. I recommend award of the bid to Bituminous Roadways in the amount of <br />$268,261 and approval of the proposal form Bolton and Menk for construction services. Note the cost <br />associated with this project are significantly less that projected. During the design process the <br />geotechnical analysis eliminated the need for the light weight fill we had thought would be required for <br />the project. <br /> <br />COUNCIL ACTION REQUESTED <br />Motion to award the 2023 Streets project to Bituminous Roadways for $268,261 and to authorize Bolton <br />& Menk to perform construction oversite for a fee not to exceed $35,000. <br /> <br />Reference <br />A. Bid Tab <br />B. Bolton and Menk Construction Services Proposal <br />Item No.: 11 Date: May 8, 2023 <br />Item Description: 2023 Street Maintenance Project (23-001) – Award <br />Presenter: Adam Edwards <br />City Administrator/City Engineer <br />Agenda <br />Section: <br />Consent Agenda
The URL can be used to link to this page
Your browser does not support the video tag.