Laserfiche WebLink
<br />Page 4 of 6 <br />9) Removals. A demolition permit must be issued and final for the encroaching improvement <br />on the existing parcel prior to submittal of final plat application. This includes a portion of <br />the garage, patio, utility and landscaping improvements, identified within Exhibit A <br /> <br />10) Development Fees. <br /> <br />A. Park Dedication Fee. The subdivision is subject to the standard Park Dedication Fee <br />requirement. The Park Dedication Fee is outlined in the City’s current 2023 Fee Schedule <br />and applied to each newly created lot on a per lot basis. Park dedication fees are based on <br />Hennepin County’s assessment of the predeveloped land value. Based on the 2023 Fee <br />Schedule, the Park Dedication Fee will be due for Lot 2 in the amount of $136,302.52. <br /> <br />B. Stormwater and Drainage Trunk Fee. The development is subject to the Stormwater and <br />Drainage Trunk Fee, as established in the 2023 Fee Schedule of $5,250 per new lot for the <br />1-acre zone. The Storm Water Drainage and Trunk Fee due at the time of Final Plat for 1 <br />new lot will be $5,250.00. <br /> <br /> C. Utility connection fees as described above. Sewer connection charge will be due for Lot <br />2 prior to Final Plat approval in the amount of $5800.00 <br /> <br /> <br />11) City Engineer Approval. Approval of the plat is subject to recommendations of City <br />Engineer Adam Edwards. <br /> <br />12) Plans and Specifications. The following plans and specifications shall be submitted for <br />review and approval by the City and other appropriate jurisdictions prior to final plat <br />approval, to ensure that the proposed plat will accomplish the intended purposes: <br /> <br />(a) Final conceptual grading, drainage and erosion control plan for the proposed <br />shared driveway, showing existing and proposed contours; any proposed <br />stormwater facilities and calculations as required by the Minnehaha Creek <br />Watershed District; proposed utility connections; and erosion control measures <br />to be used during demolition and construction. Final Plat Approval will not be <br />granted until the Minnehaha Creek Watershed District has approved the <br />stormwater management plans. <br />(b) Final plans and specifications for all proposed utility lines and services, <br />including proposed revisions, if any, to existing service facilities. <br /> <br />(b) Sufficient detail to meet the recommendations of the City Engineer.