Laserfiche WebLink
<br />Page 3 of 6 <br />1) Lot Standards. Any proposed improvements must meet all setbacks requirements of the <br />Zoning Code. <br /> <br />2) Driveway Access. Driveway access to Lots 1 and 2 shall be a shared driveway within Lot 1. <br />All other curb cuts or access points onto the adjacent County Road shall be removed. The <br />Developer shall establish the appropriate shared driveway easements and maintenance <br />covenants over the shared driveway area identified on Exhibit A. <br /> <br />3) Trail Easement. An easement for public trail purposes concurrent with required 10-foot <br />perimeter drainage and utility easement shall be granted by the Developer over the <br />northwesterly 10 feet of the plat parallel with North Shore Drive. <br /> <br />4) Municipal Sewer and Private Well. The Property is located within the Metropolitan Urban <br />Service Area (MUSA). City sewer service is available to the properties. Both Lots 1 and 2 <br />shall make individual connections to the existing sewer main in North Shore Drive. The <br />properties will be served by individual private water supply wells. <br /> <br />5) City Utility Connection Charges. The Property was fully assessed for sanitary sewer as a <br />single parcel for one unit. . A second sewer connection charge will be due for Lot 2 prior <br />to Final Plat approval in the amount of $5800.00 (2023 Fee Schedule). <br /> <br />6) Metropolitan Council Sewer Availability Charge (SAC). Met Council SAC charges for <br />the newly created lot will be due at the time of building permit for Lot 2. <br /> <br />7) Stormwater and Drainage Improvements. Final plat approval is subject to Minnehaha <br />Creek Watershed District (MCWD) approval and permits as required. Final plat approval <br />shall not be granted until the Developer has provided evidence that all required MCWD <br />permits have been obtained. Upon building permit issuance, the property owner will be <br />required to comply with individual lot stormwater and erosion control management practices. <br /> <br />8) Drainage and Utility Easements. On the final plat, Drainage and Utility Easements shall <br />be dedicated to the public 10' along all exterior property lines, and 5' either side of interior <br />property lines, except such easements shall be increased to accommodate drainage where <br />required, subject to City staff approval. If applicable, Drainage Easements shall be granted <br />over any stormwater facilities required by the Minnehaha Creek Watershed District; the <br />Drainage Easements shall be shown on the Plat. <br />