My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-22-1999 Council Work Session
Orono
>
City Council
>
1999
>
11-22-1999 Council Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2023 1:50:32 PM
Creation date
4/19/2023 1:49:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br />I <br />I <br />♦ <br />¥4 <br />i • <br />» <br />I 4 <br />I f <br />I • <br />I • <br />1999 Review of Orono Sewer Connections: Metro Lift Station 60 (Long Lake) <br />MUSA Part/Description Existing Projected Additional Connections (REC's) <br />Connections <br />1999 2000 2000-2010 2010-2020 <br />(RECs) <br />Add Total Add Total Add Total <br />Part II: Orono Schools/Industrial Park <br />1. Orono Schools, west side of OCB Rd. <br />2. Orono Industrial Park <br />50 <br />69 <br />+5 = 55 <br />+0 = 69 <br />+0 = 55 <br />+25 = 94 <br />+0 = 55 <br />+25 = 119 <br />Part III: Hackberry 26 +0 = 26 +0 = 26 +0 = 26 <br />Part IX: Fulmer Property'2 +0=2 -2=0 +0 = 0 <br />Part X: Highway 12 Corridor West <br />1 . Suganvoods Residential <br />2. Rebers Commercial (Outlot F) <br />3. Wear Commercial <br />4. Service 800 <br />5. Onen Brothers <br />6. City Offices Complex <br />7. Orono Schools Annex <br />8. Orono Middle School <br />9. 58 Acres SW 6/Willow <br />10. 60 Acres on 12 (Willow to OCB) (Res.) <br />(Non-Res.) <br />22 <br />0 <br />32 <br />3 <br />12 <br />12 <br />2 <br />0 <br />0 <br />0 <br />0 <br />+ 1 = 23 <br />+0=0 <br />+0 = 32 <br />+0 = 3 <br />+0 = 12 <br />+0 = 12 <br />+0=2 <br />+75 = 75 <br />+0=0 <br />+0=0 <br />fO = 0 <br />+2 = 25 <br />+30 = 30 <br />+0 = 32 <br />*0 = 3 <br />+5 = 17 <br />*5 = 17 <br />+0 = 2 <br />+0 = 75 <br />+25 = 25 <br />+100 = 100 <br />+70 = 70 <br />+0 = 25 <br />+0 = 30 <br />+0 = 32 1 <br />-.0 = 3 <br />+10 = 27 <br />+0 = 17 <br />+0 = 2 <br />+0 = 75 <br />+0 * 25 <br />+25 = 125 <br />+0 = 70 <br />Part XI: Highway 12 Corridor East 0 +0=0 +3=3 +0 = 3 <br />Part XIII: 650 Brown Road North 1 +0 = 1 +0 = 1 +0 = 1 <br />Part XIX: North Long Lake 31 +0 = 31 +0 = 31 +0 = 31 <br />Part XX: Long Lake Country Club 20 +0 = 20 +0 = 20 +0 = 20 <br />Part XXI: East Long Lake 0 +0=0 +10 = 10 +0 = 10 <br />Part XXIII: Fox Ridge 0 +0=0 +10 = 10 +0 = 10 <br />Part XXIX: Orono Schools/Ice Arena 12 +0 = 12 +3 = 15 +0 = 15 <br />Part XXX: Dillman Property 0 +0=0 + 1 = I +0 = 1 <br />"50 Nop-MUSA Connections Allotment"4 +-4 = «+0 = 8 +0 = 8 <br />Future MUSA Additions: <br />1. Van Ecckhout Property <br />2. Dumas/James Properties <br />3. Hackberry East <br />4. Long Lake Shorelancl <br />5. Dickey Lake Shoreland <br />0 <br />0 <br />0 <br />0 <br />0 <br />+0=0 <br />+0=0 <br />+0=0 <br />+0=0 <br />+0=0 <br />+8=8 <br />+200= 200 <br />+50 = 50 <br />+0=0 <br />+0=0 <br />+0 = 8 <br />+0 = 200 <br />+0 = 50 <br />+40 = 40 <br />+40 = 40 <br />Total LS-60 RFX's 298 +85 = 383 +545= 928 +140 =1068 <br />Total LS-60 Flow Rate (MGY)29.8 38.3 92.8 106.8 <br />1 REC = 274 gpd = 0.1 mgy <br />'Part :X: Fulmer Property will be eliminated from L.S. 60 upon completion of the Hwy 12 bypass before 2010.
The URL can be used to link to this page
Your browser does not support the video tag.