My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-22-1999 Council Work Session
Orono
>
City Council
>
1999
>
11-22-1999 Council Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2023 1:50:32 PM
Creation date
4/19/2023 1:49:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
/0/4’^hlX /I <br />1999 Review of Orono Sewer Connections: Metro Lift Station 59 (Orono) <br />I <br />I <br />MUSA Part/Description Existing <br />Connections <br />1999 <br />(RECs) <br />Projected Additional Connections (REC’s) <br />2000 <br />Add Total <br />2000-2010 <br />Add Total <br />2010-2020 <br />Add Total <br />Part I: Navarre/Forest Lake/Tonkawa <br />1. Residential' <br />2, Non-residential <br />1382 <br />153 <br />+25 =1407 <br />+2 =155 <br />+25 = 1432 <br />+20 = 175 <br />+10 =1442 <br />+10 = 185 <br />Part XII: North Shore/Scotch Pine = 13 +0 = 13 = 13 <br />Part XVI: Stubbs Bay 130 = 130 +2 = 132 = 132 <br />Part XVll: Orono Sewer Plant Property +0 =+0 = <br />Part XXXI: Maxwell Bay Area +3 +25 = 30 +25 = 55 <br />Total LS-59 RECs 1682 +30 =1712 +72 = 1784 +45 =1829 <br />Total LS-59 Flow Rate (MGY)168.2 171.2 178.4 <br />182.9 <br />'Counted as follows: <br />Sec 5S: 32 Sec 8S: 1 "54 Sec I7S:246 <br />Sec 6S: 56 Sec 9N; 5 Sec I8N:16 <br />Sec7N: III Sec 9S: 33 Sec 20N:147 <br />Sec7S: 216 Sec 16N: 5 Sec 20S:116 <br />Sec 8N: 60 Sec 17N: 102 Sec 2IN:103
The URL can be used to link to this page
Your browser does not support the video tag.