Laserfiche WebLink
year: 2001. <br />6. <br />7. <br />8. <br />9. <br />DANCOR DEVELOPMENT - Private developer construction of sewer lateral <br />system and trunk to serve 25 single family homes within MUSA. F.xpectcd <br />construction year: 2001. <br />HIGHWAY 12 CORRIDOR - Private developer construction of sewer trunk and <br />laterals to serve up to 250-300 units of multifamilv and commercial on north side <br />of Highway 12 between Willow drive and Old Cr\stal Bav Road. Expected <br />construction year: 2002-2005. <br />HIGHWAY 12 CORRIDOR • Private developer construction of sewer lateral and <br />trunk lines to serve 150-250 residential units on south side of Hiehwav 12 west of <br />Old Cry stal Bav Road. Expected construction year 2005-2010. <br />HACKBHRRY EXTENSION - Private developer construction of sewer lateral <br />system to serve 30-50 ne\s residential units cast of Willow Drive between <br />Watertown Road and Highway 12 Bypass. <br />SHORELAND AREAS - C itv/private developer construction of trunks and lateral <br />sewers to serve various existing and to-be-developed Slu~>reland areas in Lontt <br />Lake/Pickev Lake area, alone the northeast shore of Maxwell Bay, along the <br />northeast shore of Cr\stal Ba\. and along the shores of Tanager Lake. Expected <br />conrtniction year: 2010-2020. <br />EXISTING MUNICIPAL SYSTEM IMPROVEMENTS - Capital Improvements <br />to the existing municipal sewer system include the following: <br />a) Grindcf-pump replaceme nt; one eneh-'in 1980, 1981, I9 6-2 t <br />b) Lift stati on-upgra ding; depending upon (niieome of infiltrat ten study ex pected <br />in 1981;■ Lift-Stations 6. 8 and 10 mas -tnicd pump replace ment to increa se <br />ca pac ity for certa in sen’icc suba reas. <br />(NEED TO UPDATE THIS SECTION) <br />I <br />r <br />(NEED TO ADD SECTION DISCUSSING TRUNK/INTERCEPTOR <br />IMPACTS OF HVVY 12 BYPASS AND CITY PLANS TO ALLEVIATE <br />EXISTING CAPACITY DEFICIENCIES IN HVVY 12 AREA ON <br />TEMPORARY AND PERMANENT BASIS) <br />12. EXISTING INDIVIDUAL SYSTEM IMPROVEMENTS.- The On-Site <br />Management Program is expected to continue enforcing major improvements to, <br />or replacement of, 30-40 existing on-site systems each >ear for the licxt five <br />h ,1 years. <br />I <br />I <br />CMP 6-52