My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-22-1999 Council Work Session
Orono
>
City Council
>
1999
>
11-22-1999 Council Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2023 1:50:32 PM
Creation date
4/19/2023 1:49:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br />I <br />I <br />t « <br />I • <br />fr <br />ft <br />97 <br />1. <br />1 <br />4. <br />5. <br />BROWNS BAY - Construction of combination gravity and force main sewer <br />laterals along West Femdale, Shoreline Drive and Orono bane serving 30-33 <br />existing units via the same injcetor station as-the Minnetonka Bluffs system; <br />Expected eonstruetion year 1981 - 19 8 2; <br />■NORTH SHORE/SCOTCH PINE- Construetion-of combination gravit>< and force <br />main sewer laterals serving twelve existing units via an injector station into the <br />Orono-Long Lake Interceptor. Expected-construction year 198 1 • 19 8 2. <br />CARMANS BAY ■ Construction of a grtnder pump station and lateral to extend <br />service to two existing units within the MUSA. Expected eonstruetion before 19 8 5; <br />NORTl lERN AVENUE - Construction of a gravity sewer lateral and a possible Kft <br />station to extend service to four existing units within- tnc MUSA. Expected <br />eonstruetion before 19 8 5. <br />NORTH SHORE/HIGH WOOD ■ Construction of a gravity sewer lateral to extend <br />service to four existing-unitssvithin the MUSA. Expected eonstruetion before 19 tt5: <br />-CARRIAGE TRAIL • Private developer extension of gravity sewer lateral to <br />service seven new units within the MUSA. Expected eonstruetion year: 19 8 0. <br />NAVARRO ■ Private developer extension of gravity sewer lateral to service 2 4 new <br />units within the MUSA. Expected eonstruetion year; 198 0. <br />■BALDUR PARK - Private devdoper extension of gravity sewer lateral to service <br />two new units within the MUSA. Expected construction year; 1980 -1981. <br />ORONO-MEDINA INTERCEPTOR • Joint tri-city project with Medina and Long <br />Lake including lateral sewer eonstruetion in Medina. Interceptor eonstruetion in <br />Orono and bypass eonstruetion in Long Lake. Expected construetion-year^l98H <br />49«3 t <br />WEBBER HILLS - Constniction of a lateral sewer system and trunk forcemain to <br />serxe 37 existing units within the MUSA. Expected construction vear: 2000. <br />FOX RIDGE - Construction of a lateral system and trunk forcemain to serve 7-9 <br />existing units within the MUSA. Mav he designed to serve additional 7-10 units <br />which will be within future MUSA. Expected construction year: 2000. <br />EAST LONG LAKE - Construction of a lateral system and forcemain to serve 1C <br />existing units within the MUSA. Expected constniction year: 2002. <br />LAKE MINNETONKA WOODS - P'-j\.;tc develoner extension of gravity' sewer <br />lateral system to serve 29 towphomv, • 'lits within the MUSA. Under construction <br />in 1999. <br />BALDUR PARK - Private develoDcr/owncr construction oFgravity sewer lateral <br />to serve I existing and 2-3 future ut.its within the MUSA. Expected construction <br />CMP 6-51
The URL can be used to link to this page
Your browser does not support the video tag.