Laserfiche WebLink
I <br />I <br />I <br />I <br />I <br />I I <br />I <br />This portion of the municipal system was constructed as an extension of the Long Lake <br />municipal system primarily to provide sewer (and water) service to the new Orono High <br />School being built on the campus west of Long Lake. In addition, this system provides <br />service to two other schools and to the Orono Industrial Park, <br />Allflowfrom the Orono School System discharges into the Long Lake municipal system and <br />eventually into the Long Lake-Pump Station of the Orono-Long Lake Interceptor. The <br />Orono School System has additional capacity in the Orono lines hut is limited by <br />restrictions of certain downstream lines in Long Lake. <br />In a cooperative agreement with the cities of Long Lake and Medina, Orono will participate <br />in construction of a bypass line in Long Lake to alleviate the existing constriction. The basic <br />purpose of this bypass is to provide capacity for sewering the existing 83 homesites in the <br />housing cluster of Medina-Morningside to eliminate an existing health problem caused by <br />failure of the on-site systems due to small lot sizes, tight soil and high water table. This <br />project will bypass the Long Lake restrictions with a new 10" line allowing sufficient <br />capacity for Medina-Morningside to be connected to tl. • existing Orono sewer line near the <br />Orono High School. In addition, the bypass will provide reserve capacity for the Long Lake <br />industrial area and other Long Lake users, will reroute enough flow to allow permanent <br />connection of Orono's Hackberry Hills area as it exists, and will permit reallocation of the <br />existing reserve in the Orono lines to the existing system users. <br />(Need to reflect completion of Medina system, the Long Lake bypass, addition of more area <br />to MUSA in 1989, and construction of sewers serving Sugarwoods, North Long Lake, and <br />Long Lake Countr>' Club Addition) <br />3. HACKBERR Y HILLS SYSTEM <br />CAPACITY 25 residential units connected - design capacity <br />0 units reserve <br />DISCHARGE Long Lake municipal system <br />& Long Lake Pump Station of Orono-Long Lake Interceptor <br />CONSTRUCTIOS 1973 Project: 9" PVC, 15" RCP gravity <br />Hackberry Hills is a compact development of 25 homes constructed in the 1950's on small <br />lots and with poor septic systems The area was experiencing multiple system failures and <br />health hazards by the early I970's which resulted in the construction ofthese sewer laterals. <br />Because the surrounding area is rural pastureland, the project was designed and <br />constructed solely to serve these homes with no reserve capacity for future development. <br />Also, the system discharges into the Long Lake system at a location that has no capacity for <br />additional Orono service. This discharge was originally intended to be temporary; however , <br />upon completion of the Long Lake bypciss. there will be sufficient Long Lake capacity to <br />accommodate these 25 units on a permanent basis. <br />(Onlv minor chances needed re Hackberry) <br />CMP 6-38