My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-22-1999 Council Work Session
Orono
>
City Council
>
1999
>
11-22-1999 Council Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2023 1:50:32 PM
Creation date
4/19/2023 1:49:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
■The following section needs significant updating- <br />/. SOUTHWEST ORONO SYSTEM <br />CAPACITY 1511 units connected (1369 residential: 142 non-residential) <br />1099 units reserve <br />2610 units design capacity <br />DISCHARGE Orono Pump Station of Orono-Long Lake Interceptor <br />CONSTRUCTION Six (6) Projects I964U979 <br />1964 Project: 8'\ JO”, 12”. 15” VCP gravity: 8 ” 10” CIP force main <br />1966 Project: 8 ”. 10” VCP gravity: 4”, 6” CIP force main <br />1967 Project: 8 ” VCP gravity <br />1970 Project: 8 ” VCP gravity: 4”. 6” CIP force main <br />1973 Project: 6”. 9” P VC & 12”, 15" RCP gravity: 2”. 4”. 6” DIP force main <br />1979 Project (private): 8" PVCgravity <br />SPECIAL FEATURES 29 wet wells and lift sattions <br />3 grinder pump stations <br />4 underwater channel crossings <br />2 force main bridge crossings <br />30% of the line is on private easements <br />This is the original municipal sewer system and it still serves the majority of urban Orono. <br />These lines were installed to provide pollution abatement and sewer service to the Navarre <br />business area and to the urban residential areas along Lake Minnetonka. The system was <br />originally designed with capacity to discharge flow from the saturation population in the <br />areas currently served including those areas designated for servi:e but not yet developed. <br />The original design included capacity for Minnetonka Beach. T lose portions of the trunk <br />sewer carrying Minnetonka Beach flow are now operated by MIVCC as the Minnetonka <br />Beach Interceptor. <br />fNeed to reflect addition of Stubbs Bav. North Shore Drive, Little Orchard. Etc.) <br />2. ORONO SCHOOLS S YSTEM <br />CAPACITY 100 units connected (2 residential: 98 non-residential) <br />0 units reserve because of restrictions in Long Lake <br />120 units future reserve with construction of Long Lake bypass <br />planned for 1981 <br />220 units design capacity for Orono <br />DISCHARGE Long Lake municipal system <br />(& Long Lake Pump Station of Orono-Long Lake Interceptor <br />CONSTRUCTION 1967 Project: 8" VCP gravity <br />CMP 6-37 <br />I <br />I <br />I
The URL can be used to link to this page
Your browser does not support the video tag.