My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-22-1999 Council Work Session
Orono
>
City Council
>
1999
>
11-22-1999 Council Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2023 1:50:32 PM
Creation date
4/19/2023 1:49:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />[ <br />I <br />I <br />I <br />6. <br />11. <br />12. <br />13. <br />Workshop. Materials and construction methods are regulated by code consistent with WPC' <br />4 0 and Minnesota Board of-Hcalth (plumbing code) the Chapter 7080 standards. <br />Construction inspection - The City On-Site Systems Manager inspects each proposed site after <br />receipt of a subdivision or building permit application and before approval of either. He works <br />with the developer and the developer's site evaluator to identify any site characteristics which <br />will affect the use of ISTS on the site. He reviews in the field the actual data submitted and <br />the physical properties of the site. He approves, modifies or rejects the proposed design (many <br />subdivision lot boundaries have been adjusted following such an inspection). The Manager <br />placards each drainfield-^ite to keep eenstruction activities away (sec Appendix). The <br />developer is required to fence each approved drainfield site prior to commencement of any <br />site improvements. After issuance of the ISTS construction permit, inspection is made at least <br />twice during the work and befere-the-system is buried throughout all phases of system <br />installation. <br />7. Scheduled inspections - the City inspector periodically inspects all existing on-site systems <br />in the City to determine operating characteristics and to detect operating deficiencies. Newer <br />systems are inspected at least once every three years with older systems programmed for <br />annual inspection. <br />8. On-Call inspections - The City Inspector will inspect any system upon receipt of a question <br />from the owner or a complaint by a neighbor to assist in handling problems or to enforce <br />compliance with proper operating standards. <br />9. Construction records - The City keeps permanent files of each system's site evaluation report, <br />design specifications and actual construction including contractor and dimensioned sketches <br />of actual system component location. <br />10. Operation records - an inspection Record is made upon every inspection of each system <br />including notice to the owner of operational characteristics and/or any orders for correction <br />of deficiencies <br />Pumping records - Each septic tank is required to be pumped-out every three years. Records <br />submitted by the licensed pumpers arc kept of every pump-out in the City to assure pumping <br />on schedule and to warn of excessive pumping indicative of improper system operation. <br />Ordinance enforcement - the Ofrimnnec Section 1 2.30 provides that each owner is responsible <br />for the correct operation of any on-site system. Repairs or corrections if necessaiy' are ordered <br />with reasonable times given for compliance dependent upon the nature of the problem. Non- <br />compliance is a misdemeanor subject to criminal citation, or can be corrected through civil <br />enforcement including injunction. <br />Administration - all portions ofOfdinanee-2 10 Section 1 2.30 are administered by a full time <br />City employee identified as the On-Site Systems Manager. All costs of the program are funded <br />by user fees in the form of permits, plan review fees and an annual inspection fee charged to <br />each operator of an existing onsite system ISTS through a computerized billing system <br />identical to typical sewer and water utility billing. <br />CMP 6-30 <br />i
The URL can be used to link to this page
Your browser does not support the video tag.