Laserfiche WebLink
1. <br />2. <br />3. <br />The owners of all buildines where central sewer is available or becomes <br />available, shall connect the buildings to the Citv sewer within 16 months of the <br />availability of the sewer according to the provisions of the City Code. <br />At the time connection to Citv sewer is completed, all existing septic tanks no <br />longer in use sail be pumped out and filled with native soil. <br />The owners of those buildings which have been completely connected to central <br />sewer shall be exempt from the maintenance and inspection provisions of this <br />Section. <br />Administration of Ordinance No. 210 Section 12.30 inciudes all of the following requirements <br />and procedures which are consistent with the pol icies of the water quality-chapter o f the <br />Metropo litan Dev elo pment Guide general guidelines of the Metronolitan Council's Water <br />Resources Management Policy Plan <br />1. Subdivision regulations - no new subdivision is approved unless sewer is available or each lot <br />has been evaluated and proven to be aeecptable-fer have both primary and alternate drainfield <br />sites for construction of an ISTS o n-si te system in stallation . <br />2. Building regulations - no building permit is issued for new construction unless municipal <br />sewer is available or until the lot has been evaluated and proven capable of accepting all <br />development plus a primary and secondary drainfield area, and until the proposed on-site <br />design has been submitted and approved. No building permit is issued for any addition to <br />properties connected to on-site systems unless the existing system has been inspected by the <br />City and found to be o peratin g pro perly compliant, or, if substan dard noncomolian t. has been <br />upgraded to current requirements. <br />3. Site evaluation - soils in all areas of the City have been surveyed an d mapped by the Henn epin <br />Coun ty Soi l an d Water Cense rs’ation Service identified in the Hennepin Countv Soil Survey. <br />All site evaluation reports must relate soil type, topography and water table to the proposed <br />drainfield type and location. Site evaluation includes analysis of results from two soil borings <br />and four percolation tests in the primary draint ficid plus o n e bo ring and two perco latio n tests <br />in the seco ndary drainfie ld. and alternate drainfield sites. No system is permitted in flood <br />prone areas, near nor within established setbacks from creeks, lakeshore or marshland, or on <br />steep slopes (Orono has no bedrock situations). <br />4. System design and location - detailed construction draw ings and systcTn design information <br />are req uired before issuance of any on -site con structio n ISTS installa.i t permit in cludin g <br />gfestgn flow criteria, so il type, tan k, bed an d distribution system design. S\ ucm types are <br />regulated by the results of the site evaluation including standard and alternative designs <br />.''ependent upon soil type. The Citv is currently investigating whether or not to adopt <br />provisions of the the recently revised Chapter 7080 in regards to allow ing the use of <br />"Performance Systems”. <br />5. System construction - all new system installation or existing system repair or alteration is <br />subject to the issuance of a construction permit. All permittees must be licensed by the-City <br />State of M innesota an d must show evidenc e-o f qual ifleation in cluding co ntin uin g educatio n <br />in the Untv ewitv of Minn esota Agricultural Exten sion Sen ‘iee Ho me Sewage Treatment <br />I <br />I <br />I <br />1 <br />1 <br />CMP 6-29