My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-13-1999 Council Packet
Orono
>
City Council
>
1999
>
12-13-1999 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2023 1:42:32 PM
Creation date
4/19/2023 1:39:13 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Bonestroo <br />Rosene <br />Anderlik & <br />1 Associates <br />Engineers & Architects <br />September 15, 1999 <br />Mr. Paul Weinberger <br />Zoning Administrator/Planner <br />City of Orono <br />Post Office Box 66 <br />Crystal Bay. MN 55323 <br />Re: Willow View Subdivision <br />File No. 139GEN-2522 <br />Sc^etT’JO Arae*'»<t tnc ts .nr Cppor[vn$r/ irrs c/e* <br />.“*• r: o.ns C::z G 3ore.:rc3 • Joiesn c Ance'b>i ?£ • r* t Scr/^tj PE • <br />Cif*''* ^ Coo* ®E • "^cCe'C G SC^unirnt. P£ • A Bou^dor p£ • <br />Hzztn i?oxe'*tf. P6 P E Turne*' P£ #r*o Susjn M EOer»«r. CPA . Ser s* Consultants <br />Asscc^jee Prrc pjni Howard A Sanford. P£ • Kenn A Gordon. P£ • .?oocrt ^ Pfefferie. Pi. • <br />ff.:-ard u/ Foste'' P£ • David O Losicota. P£ • f?oo<rt C. Russet. Ai A • Mart A Hanson. Pi • <br />V*cra<i r f?aur-nann P£ • Ted < F«eid. P£ • Kenneth P Andersen .»£ • Mart .R Rolfs. Pi. • <br />S*drey P Vfc'.i:ian*son. Pi. l S • Rocert F Kctsmiin • Agnes M Ring • Allan R<ct Senmidt. P£ <br />Cf* its St f'aui. Rocr*ester M/ iirrtr and St Ctoud. VN • Miiwac«ee. Wi <br />wwwocnesrroo :om <br />Dear Paul: <br />We have reviewed the preliminary grading and utility plan for the proposed 49 lot Willow View subdivision. <br />The site is located west of Willow Drive and south of County Road 6 in the southeast quarter of Section 28. <br />We have the following comments in regards to engineering matters. <br />1. Sanitary Sewer: The preliminary sanitary sewer design appears acceptable. It should be noted that the <br />proposed temporary bypass lift station along T.H. 12 needs to be in place before sewer service can be <br />provided to the Willow View site. Final plans should include plan and profile views of the proposed <br />sewer, sewer service locations and sanitary sewer details. Sanitary services should be located 3*feet <br />downstream from water services. All sanitary and storm sewer manholes are required to have an exterior <br />sealing sleeve as manufactured by Infi-Shield or an approved equal. Any connections to existing manholes <br />shall be core drilled and a rubber boot installed. <br />2. Water Main: The proposed water main shown between Lots 12 and 13, Block 3 should be extended <br />westerly and tied into the 12-inch water main installed as part of the new Orono Middle School project. <br />The water main alignment should coincide with the utility easement on the school property located just <br />south of the soccer fields. We also recommend extending the 8-inch water main northerly to the <br />intersection of Willow Drive and County Road 6. This will allow for a futtire connection to the City of <br />Medina’s water system. Final plans should include plan and profile views of the proposed water main, <br />water main details and service locations. All water main shall be poly wrapped. <br />3. Grading: We recommend that the lowest basement elevations be at least 2-feet higher than the high water <br />level (HWL) of the closest pond. Proposed basement elevations on some lots on Blocks 1,2 and 3 do not <br />provide this 2-feet of freeboard. We would recommend revising the grading plan or basement elevations <br />to allow a minimum of 2-feet of freeboard. It appears that ponds located in Outlet C will flood the <br />property to the south when they reach their HVM-. We recommend revising the proposed grading plan so <br />tha; ponded water is contained to at least 0.5-feet above the HWL. Block 5 appears to have a low, <br />landlocked area behind the homes. This will result in drainage problems and additional storm sewer may <br />be necessary. An erosion control plan should be submitted for review. <br />4. Siorm Sewer: The draft version of the City’s Surface Water M.tnagcment Plan (SWMP) shows that this <br />si e lies within the Long Lake drainage district. The proposed grading plan shows ponding throughout <br />the sire. It is unclear how all of the ponds are supposed to function. None of the ponds has an outlet <br />shown. The pond in the northwest comer of the site has no inlet or outlet shown. The pipe shown <br />between Lc's 6 and 7, Block 3 outlets to a wetland. All stonn sewer should outlet to a ponding area. All <br />ponds should meet NURP standards. Ponds should have a 10:1 aquatic bench at the pond’s normal water <br />2335 West Highway 36 ■ St Paul. MN 55113 ■ 651-636*4600 • Fax: 651-636-1311
The URL can be used to link to this page
Your browser does not support the video tag.