Laserfiche WebLink
Recommendations and Conclusion <br />The design and construction of the Highway 12 Bypass Lift Station should proceed as described in <br />this report. This lift station is necessary to provide adequate capacity for the new Orono Middle <br />School. <br />The design and construction of the Femdale area lift station rehabilitation project should proceed as <br />described in this report. This consists of the rehabilitation of Lift Station No. 1 and total <br />replacement of Lift Stations 2,3,4, and 5. <br />It is recommended that the existing 2-inch forcemain in the Femdale area remain in service, as <br />installing larger forcemain or installing deep gravity sewer would be costly, disruptive, and is not <br />necessary based on the number of service connections. It is advisable and may become necessary <br />for the City to require that private property infiltration and inflow defects be corrected. <br />Beginning the lift station projects at this time would allow the Highway 12 Bypass Lift Station to be <br />placed in service by July 1,2000. Establishing a completion date of September 30,1999 is <br />recommended for the Femdale area lift stations. <br />A project cost of $365,000 is estimated, not including easement costs. Of the total, $135,000 is <br />attributable to the Highway 12 Bypass Lift Station and $230,000 is attributable to the Femdale area <br />lift stations. <br />K:\i39\I3999 10'^warttrepons^ letter reportioc