Easements <br />Permanent easements and temporary construction easements are required for Lift Stations 3,4, and <br />5. <br />Lift Stations 1 and 2 appear to be within public right-of-way. A temporary construction easement <br />may be desirable to obtain a sufficient construction area for Lift Station 2. Since Lift Station 1 does <br />not require structure replacement, easement acquisition should not be necessary. <br />The Highway 12 Bypass Lift Station will require a temporary easement. A potential location is in <br />the northeast comer of the Washington Scientific property. This lift station will no longer be <br />necessary after sanitaiy sewer improvements in conjunction with the future Highway 12 project are <br />completed. Therefore, the easement could be structured to expire at a future date when the lift <br />station is no longer necessary. <br />Project Schedule <br />At this time, it is estimated that the construction of the Highway 12 Bypass Lift Station will need to <br />be completed by July 1,2000. This date could change pending the progress of school construction. <br />The Femdale Area lift station projects should be completed during the 2000 construction season. <br />A potential project schedule is as follows: <br />November 1999 <br />December 1999 <br />January 2000 <br />February 2000 <br />March 2000 <br />July 1,2000 <br />City Council orders easement preparation and project design. <br />Easement preparation. <br />Project design. <br />Easements acquired, construction bidding process. <br />Open bids. <br />Highway 12 Bypass Lift Station in-service. <br />September 30,2000 Femdale area lift stations placed into service. <br />K:\139\ !J999I07\worJ\reportsMett€r repcrtd^