My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-10-2023 Council Packet
Orono
>
City Council
>
2023
>
04-10-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 10:03:43 AM
Creation date
4/17/2023 10:00:40 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />www.pca.state.mn.us • 651-296-6300 • 800-657-3864 • Use your preferred relay service • Available in alternative formats <br />wq-strm2-47 • 9/27/18 Page 3 of 11 <br />Yes N/A The plan sheets should contain the following <br />(continued): <br />Yes N/A <br /> Construction activity areas that are adjacent <br />to and drain to Public Waters for which the <br />Minnesota Department of Natural Resources <br />(DNR) has promulgated “work in water <br />restrictions” during specified fish spawning <br />time frames <br /> 50 foot buffer zones <br /> 100 foot permanent buffer zones <br /> Locations and types of all temporary and permanent <br />erosion prevention and sediment control BMPs <br /> Locations of areas where construction will be phased <br />to minimize duration of exposed soil areas <br />Yes N/A Standard plates or specifications: <br /> Are standard plates or specifications included where <br />appropriate? <br /> Notes <br /> <br />Construction activity requirements <br />Yes N/A Erosion prevention measures: <br /> Exposed soils (including stockpiles) have erosion <br />protection/cover initiated immediately and completed <br />within 14 days (or 7 days per Section 23) <br /> For DNR Public Waters with “work in waters <br />restrictions” during specified fish spawning time <br />frames, stabilization must be completed for all <br />exposed soil areas within 200 feet of the water’s edge, <br />and draining to the water, within 24 hours during the <br />restriction period <br /> The wetted perimeter of the last 200 linear feet of <br />ditches must be stabilized within 24 hours of <br />connecting to a surface water or property line <br /> Temporary or permanent ditches or swales that are <br />being used as a sediment containment system during <br />construction must be stabilized within 24 hours after <br />no longer being used as a sediment containment <br />system <br /> Pipe outlets must have energy dissipation within 24 <br />hours of connecting to a surface water or permanent <br />stormwater treatment system <br /> Mulch, hydromulch, tackifier, polyacrylamide, or similar <br />erosion prevention practices cannot be used within the <br />normal wetted perimeter of drainage ditches or swale <br />sections with a continuous slope greater than 2% <br /> Notes <br /> <br /> <br />Yes N/A Sediment control measures: <br /> Sediment control practices are established on <br />downgradient perimeters and upgradient of any buffer <br />zones <br /> Sediment control practices are established at the base <br />of stockpiles on the downgradient perimeter <br /> Stockpiles are located outside of natural buffers or <br />surface waters, including stormwater conveyances <br />(e.g., curb and gutter systems) unless there is a <br />bypass <br /> Inlet protection BMPs included <br /> Vehicle tracking BMPs established where vehicles are <br />exiting the site to minimize street tracking <br /> <br /> Notes <br />
The URL can be used to link to this page
Your browser does not support the video tag.