Laserfiche WebLink
<br />www.pca.state.mn.us • 651-296-6300 • 800-657-3864 • Use your preferred relay service • Available in alternative formats <br />wq-strm2-47 • 9/27/18 Page 2 of 11 <br />Yes N/A SWPPP narrative should contain the following <br />(continued): <br /> A description of the permanent stormwater treatment <br />system <br /> A description of procedures to amend the SWPPP <br /> A description of methods used to minimize soil <br />compaction and preserve topsoil <br /> In designing the stormwater controls, the SWPPP must <br />account for: <br />Yes N/A <br /> The expected amount, frequency, intensity <br />and duration of precipitation <br /> The nature of stormwater runoff and run-on at <br />the site, including factors such as expected <br />flow from impervious surfaces, slopes and site <br />drainage features <br /> The range of soil particles expected to be <br />present <br /> The stormwater volume, velocity, and peak <br />flowrates to minimize discharge of pollutants <br />in stormwater and to minimize channel and <br />streambank erosion and scour in the <br />immediate vicinity of discharge points <br /> A description of any specific chemicals and chemical <br />treatment systems used for enhancing the <br />sedimentation and how compliance with item 9.18 will <br />be achieved <br /> Acres of impervious surfaces (pre- and post- <br />construction) <br /> If permittees determine compliance with the following <br />requirements is infeasible, document the <br />determination: <br />Yes N/A <br /> Temporary sediment basins (must describe <br />alternative BMPs used) <br /> If the permanent treatment system for linear <br />projects cannot be constructed within the <br />right-of-way (reasonable attempt to obtain <br />the right-of-way must be made) <br /> Buffer zones <br /> The full volume reduction requirement <br /> Any required site assessments for groundwater or soil <br />contamination <br /> Tabulated quantities of all erosion prevention and <br />sediment control BMPs anticipated for the life of the <br />project <br /> Notes <br /> <br /> <br />Yes N/A The plan sheets should contain the following: <br /> A site map or maps including: <br />Yes N/A <br /> Existing and final grades <br /> Drainage area boundaries <br /> Direction of stormwater flow <br /> All discharge points where stormwater is <br />leaving the site or entering a surface water <br /> Soil types <br /> Impervious surfaces <br /> Locations of potential pollutant generating <br />activities (as identified in Section 12) <br /> Areas of steep slope (3:1 or greater) <br /> All surface waters, existing wetlands, and <br />stormwater ponds/basins within one aerial <br />mile that receive stormwater from the <br />construction site, during or after construction <br /> Note: If they do not fit on the plan sheets, <br />use an arrow to note the direction and <br />distance <br /> Notes <br /> <br />