My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-10-2023 Council Packet
Orono
>
City Council
>
2023
>
04-10-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 10:03:43 AM
Creation date
4/17/2023 10:00:40 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• 651-296-6300 • 800-657-3864 • Use your preferred relay service • Available in alternative formats https://www.pca.state.mn.us <br />wq-strm4-49a • 9/23/20 Page 28 of 32 <br />144.D. Removal of organic matter via street sweeping. <br />144.E. Implementation of infiltration structural stormwater BMPs. <br />144.F. Management of areas that attract dense populations of waterfowl (e.g., riparian plantings). <br />144.G. Other (describe below): <br />144.H. <br />145.Permit item 12.9: If yes in Q141, who is or will be responsible for implementation of this required component (i.e., <br />inventory, plan, and BMP implementation)? List name(s) or position title(s): <br />*146. Permit item 22.5: Do you have an applicable WLA where a reduction in pollutant loading is required for chloride? <br /> Yes <br /> No (Skip to Q151) <br />147.If yes in Q146, do you document the amount of deicer applied each winter maintenance season to all your <br />owned/operated surfaces? (Note: All or some of this item is a new permit requirement. Compliance with new <br />requirements is required within 12 months after receiving permit coverage.) <br /> Yes <br /> No <br />148.If yes in Q146, each calendar year do you conduct an assessment of your winter maintenance operations to reduce <br />the amount of deicing salt applied to your owned/operated surfaces and determine current and future opportunities <br />to improve BMPs? You may use the MPCA’s Smart Salting Assessment Tool or other available resources and <br />methods to complete this assessment. The assessment must be documented. (Note: All or some of this item is a <br />new permit requirement. Compliance with new requirements is required within 12 months after receiving permit <br />coverage.) <br /> Yes <br /> No (Skip to Q150) <br />149.If yes in Q148, what does your winter maintenance operations assessment include? (Check all that apply) <br />149.A. Operational changes such as pre-wetting, pre-treating the salt stockpile, increasing plowing prior to deicing, <br />monitoring of road surface temperature, etc. <br />149.B. Implementation of new or modified equipment providing pre-wetting, or other capability for minimizing salt use. <br />149.C. Regular calibration of equipment. <br />149.D. Optimizing mechanical removal to reduce use of deicers. <br />149.E. Designation of no salt and/or low salt zones. <br />149.F. Other (describe below): <br />149.G. <br />149.H. Additional information for checked items (optional): <br />150.Permit item 12.9: If yes in Q146, who is or will be responsible for implementation of this required component (i.e., <br />documenting deicer applied and winter maintenance operations assessment)? List name(s) or position title(s): <br />*151. Permit item 22.7: Do you have an applicable WLA where a reduction in pollutant loading is required for temperature? <br /> Yes <br /> No (Skip to Q155)
The URL can be used to link to this page
Your browser does not support the video tag.