Laserfiche WebLink
• 651-296-6300 • 800-657-3864 • Use your preferred relay service • Available in alternative formats https://www.pca.state.mn.us <br />wq-strm4-49a • 9/23/20 Page 27 of 32 <br />136.D. Schedule(s) for maintenance of structural stormwater BMPs and outfalls when necessary maintenance cannot <br />be completed within one year of discovery (Note: All or some of this item is a new permit requirement. <br />Compliance with new requirements is required within 12 months after receiving permit coverage.) <br />136.E. Stormwater management training events, including general subject matter covered, names and departments of <br />individuals in attendance, and date of each event. <br />*137. Permit item 21.14: Do you document pond sediment excavation and removal activities? <br /> Yes <br /> No (Skip to Q139) <br />138.If yes in Q137, what pond sediment excavation and removal activity information is documented? <br />(Check all that apply) <br />138.A. A unique ID number and geographic coordinate of each stormwater pond from which sediment is removed. <br />138.B. The volume (e.g., cubic yards) of sediment removed from each stormwater pond. <br />138.C. Results from any testing of sediment from each removal activity. <br />138.D. Location(s) of final disposal of sediment from each stormwater pond. <br />138.E. Additional information for checked items (optional): <br />140.Provide any additional information about your current pollution prevention/good housekeeping for municipal <br />operations program that you would like to share (optional): (Maximum 10 lines of text) <br />Discharges to Impaired Waters with an EPA-Approved TMDL that Includes an Applicable Waste Load <br />Allocation (WLA) <br />To determine if you have an applicable WLA(s), please reference the MPCA’s MS4 Permit TMDL Application Form webpage at <br />https://stormwater.pca.state.mn.us/index.php?title=Guidance_for_completing_the_MS4_Permit_TMDL_Application_Form. <br />*141. Permit item 22.3: Do you have an applicable WLA where a reduction in pollutant loading is required for bacteria? <br /> Yes <br /> No (Skip to Q146) <br />142.If yes in Q141, do you maintain a written or mapped inventory of potential areas and sources of bacteria (e.g., <br />dense populations of waterfowl or other bird, dog parks)? (Note: All or some of this item is a new permit <br />requirement. Compliance with new requirements is required within 12 months after receiving permit coverage.) <br /> Yes <br /> No (Skip to Q145) <br />143.If yes in Q142, do you maintain a written plan to prioritize reduction activities to address the areas and sources <br />identified in the inventory? The written plan must include BMPs you will implement over the permit term. <br />(Note: All or some of this item is a new permit requirement. Compliance with new requirements is required within <br />12 months after receiving permit coverage.) <br /> Yes <br /> No (Skip to Q145) <br />144.If yes in Q143, which of the following are included in your written plan? (Check all that apply) <br />144.A. Water quality monitoring to determine areas of high bacteria loading. <br />144.B. Installation of pet waste pick-up bags in parks and open spaces. <br />144.C. Elimination of over-spray irrigation at permittee land owned areas. <br /> <br />*139. Permit item 12.4: Who is responsible for implementation of this MCM? List name(s) or position title(s).