My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-10-2023 Council Packet
Orono
>
City Council
>
2023
>
04-10-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 10:03:43 AM
Creation date
4/17/2023 10:00:40 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• 651-296-6300 • 800-657-3864 • Use your preferred relay service • Available in alternative formats https://www.pca.state.mn.us <br />wq-strm4-49a • 9/23/20 Page 23 of 32 <br />107.If yes in Q106, what enforcement tools are included in your ERPs? (Check all that apply) <br />107.A. Verbal warning <br />107.B. Notice of violation <br />107.C. Administrative order <br />107.D. Fine <br />107.E. Criminal action <br />107.F. Civil penalty <br />107.G. Other (describe below): <br />107.H. <br />*108. Please specify name or position title of responsible person(s) for conducting enforcement: <br />*109. Permit item 20.20: Do you document each site plan review you conduct? <br /> Yes <br /> No (Skip to Q111) <br />110.If yes in Q109, what do you document in your site plan review process? (Check all that apply) <br />110.A. Supporting documentation used to determine compliance, including any calculations for the permanent <br />stormwater treatment system. <br />110.B. The water quality volume that will be treated through volume reduction practices compared to the total water <br />quality volume required to be treated. (Note: All or some of this item is a new permit requirement. <br />Compliance with new requirements is required within 12 months after receiving permit coverage.) <br />110.C. Documentation associated with off-site treatment projects you authorize, including rationale to support the <br />location of permanent stormwater treatment projects in accordance with items 20.10 and 20.11. <br />(Note: All or some of this item is a new permit requirement. Compliance with new requirements is <br />required within 12 months after receiving permit coverage.) <br />110.D. Payments received and used in accordance with permit item 20.14. <br />110.E. All legal mechanisms drafted in accordance with permit item 20.15, including date(s) of the agreement(s) and <br />name(s) of all responsible parties involved. <br />*111. Permit item 20.21: Do you document training related to your Post-Construction Stormwater Management program? <br /> Yes <br /> No (Skip to Q113) <br />112.If yes in Q111, what are you documenting? (Check all that apply) <br />112.A. General subject matter covered <br />112.B. Names and departments of individuals in attendance (Note: All or some of this item is a new permit <br />requirement. Compliance with new requirements is required within 12 months after receiving permit <br />coverage.) <br />112.C. The date of each event <br />*113. Permit item 20.22: Do you document enforcement conducted pursuant to your ERPs in item 20.19, including verbal <br />warnings? <br /> Yes <br /> No (Skip to Q115) <br />114.If yes in Q113, what do you document relating to ERPs for MCM 5? (Check all that apply) <br />114.A. <br />114.B. <br />114.C. <br />114.D. <br />114.E. <br />114.F. <br /> The name of the person responsible for violating the terms and conditions of your regulatory mechanism(s) <br />The date(s) and location(s) of the observed violation(s) <br /> A description of the violation(s) <br /> Corrective action(s) issued <br /> Referrals to other regulatory organizations <br /> The date(s) violation(s) are resolved
The URL can be used to link to this page
Your browser does not support the video tag.