Laserfiche WebLink
• 651-296-6300 • 800-657-3864 • Use your preferred relay service • Available in alternative formats https://www.pca.state.mn.us <br />wq-strm4-49a • 9/23/20 Page 22 of 32 <br />j.That receive stormwater runoff from these types of entities regulated under NPDES for industrial stormwater: <br />automobile salvage yards; scrap recycling and waste recycling facilities; hazardous waste treatment, storage, <br />or disposal facilities; or air transportation facilities that conduct deicing activities. <br />101.G. Permit item 20.10: For non-linear projects, where the water quality volume cannot cost effectively be treated on the <br />site of the original construction activity, you must identify, or may require owners of the construction activity to <br />identify, locations where off-site treatment projects can be completed. If the entire water quality volume is not <br />addressed on the site of the original construction activity, the remaining water quality volume must be addressed <br />through off-site treatment and, at a minimum, ensure the requirements of permit items 20.11 through 20.14 are met. <br />101.H. Permit item 20.11: You must ensure off-site treatment project areas are selected in the following order of <br />preference: <br />a.Locations that yield benefits to the same receiving water that receives runoff from the original construction <br />activity <br />b.Locations within the same DNR catchment area as the original construction activity <br />c.Locations in the next adjacent DNR catchment area up-stream <br />d.Locations anywhere within your jurisdiction <br />101.I. Permit item 20.12: Off-site treatment projects must involve the creation of new structural stormwater BMPs or the <br />retrofit of existing structural stormwater BMPs, or the use of a properly designed regional structural stormwater BMP. <br />Routine maintenance of structural stormwater BMPs already required by this permit cannot be used to meet this <br />requirement. <br />101.J. Permit item 20.13: Off-site treatment projects must be completed no later than 24 months after the start of the <br />original construction activity. If you determine that more time is needed to complete the treatment project, you <br />must provide the reason(s) and schedule(s) for completing the project in the annual report. <br />101.K. Permit item 20.14: If you receive payment from the owner of a construction activity for off-site treatment, you must <br />apply any such payment received to a public stormwater project, and all projects must comply with permit items <br />20.11 through 20.13. <br />101.L. Permit item 20.15: You must include the establishment of legal mechanism(s) between you and owners of <br />structural stormwater BMPs not owned or operated by you, that have been constructed to meet the requirements <br />in Section 20. The legal mechanism(s) must include provisions that, at a minimum: a.Allow you to conduct inspections of structural stormwater BMPs not owned or operated by you, performnecessary maintenance, and assess costs for those structural stormwater BMPs when you determine theowner of that structural stormwater BMP has not ensured proper function.b.Are designed to preserve your right to ensure maintenance responsibility, for structural stormwater BMPs notowned or operated by you, when those responsibilities are legally transferred to another party. <br />c.Are designed to protect/preserve structural stormwater BMPs. If structural stormwater BMPs change, causingdecreased effectiveness, new, repaired, or improved structural stormwater BMPs must be implemented toprovide equivalent treatment to the original BMP. <br />*102. Permit item 20.16: Do you maintain a written or mapped inventory of structural stormwater BMPs that you do not own or <br />operate that meet all of the following criteria? (Note: All or some of this item is a new permit requirement. Compliance <br />with new requirements is required within 12 months after receiving permit coverage.) <br />a.The structural stormwater BMP includes an executed legal mechanism(s) between you and owners responsible for the <br />long-term maintenance, as required in item 20.15; and <br />b.The structural stormwater BMP was implemented on or after August 1, 2013. <br /> Yes <br /> No <br />*103. Permit item 20.17: Do you to have written procedures for site plan reviews to ensure compliance with requirements of your <br />regulatory mechanism(s)? <br /> Yes <br /> No <br />*104. Permit item 20.18: Do individuals receive training commensurate with their responsibilities as they relate to your Post- <br />Construction Stormwater Management program? Individuals include, but is not limited to, individuals responsible for <br />conducting site plan reviews and/or enforcement. <br /> Yes <br /> No (Skip to Q106) <br />105.If yes in Q104, do previously trained individuals attend a refresher training every three (3) calendar years following the initial <br />training? (Note: All or some of this item is a new permit requirement. Compliance with new requirements is required <br />within 12 months after receiving permit coverage.) <br /> Yes <br /> No <br />*106. Permit item 20.19: Do you maintain written ERPs to compel compliance with your regulatory mechanism(s) required in <br />Section 20? (Note: All or some of this item is a new permit requirement. Compliance with new requirements is <br />required within 12 months after receiving permit coverage.) <br /> Yes <br /> No (Skip to Q108)