My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-19-1999 Council Work Session Packet
Orono
>
City Council
>
1999
>
08-19-1999 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2025 10:28:52 AM
Creation date
4/13/2023 4:24:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
\ t <br />X <br />PROPOSED REPAIRS/IMPROVEMENTS TO THE CRYSTAL BAY POST OFFICE <br />The year 2000 budget includes two improvements to the Crystal Bay Post Office: <br />1 <br />2. <br />The first is the replacement of the windows. The current windows are in poor <br />condition. The glass is loose in the window frames and provides very poor <br />insulation. The cost of window replacements is estimated at $5,500.00. <br />Replacement of furnace and air conditioner. The post office currently has a furnace <br />that bums fuel oil which means there is an outside fuel storage tank that serves the <br />furnace. Replacement of the furnace with a natural gas furnace would enable the <br />outside fuel storage tank to be eliminated. The estimated cost to replace the furnace <br />and remove the fuel storage tank is $3,100.00. <br />The post office currently has a window air conditioner. If the City wants to replace <br />the window air conditioner with a central air conditioning unit, it would make sense <br />to make the switch prior to installing the new windows. The cost of the central air <br />conditioning unit is estimated at $2,500.00. <br />•1 <br />•f <br />4
The URL can be used to link to this page
Your browser does not support the video tag.