Laserfiche WebLink
PUBLIC WORKS YEAR 2000 CAPITAL OUTLAY REQUESTS <br />The following is a listing and short explanation of Public Works Capital Outlay items included in <br />the year 2000 budget; <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />Replacement of traffic signs and cones. This request includes 25 traffic cones, 2 <br />"road work" signs, and 2 sign stands. These replace present cones and signs that do <br />not meet current regulations. The estimated cost is $1,000.00. <br />Replacement of one ton plow truck. The truck to be replaced is 13 years old with <br />95,000 miles and is in poor condition. Replacement cost is $43,000.00, which <br />includes the truck, box, plow, and sander. <br />Replacement of a 3/4 ton plow truck. The truck to be replaced is 15 years old with <br />124,000 miles and is in very poor condition. The replacement cost is $29,000.00 <br />which includes the truck, box, plow, and sander. <br />Replacement of sander and plow. These replace a sander and plow that are 13 years <br />old. The estimated cost is $8,000.00. <br />Two hand held 2-way portable radios. These radios are to be used during traffic <br />control for water breaks, paving, etc. These radios would enable the City's radio <br />channel to remain available for other uses. The estimated cost is $350.00. <br />Welding room improvements. The improvements included the replacement of the <br />exhaust fan blower and lighting improvements. The estimated cost is $1,000.00. <br />• )»