My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-27-1999 Council Packet
Orono
>
City Council
>
1999
>
09-27-1999 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2023 4:11:50 PM
Creation date
4/13/2023 4:09:09 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
From Peter J Bedker To Wike Gaffiron Dale 6/17/99 Time 11 23 00 AM Page 3 of < <br />Mr. Weinberger • June 16, 1999 <br />Page 2 <br />(Simons 1996, Simons 1999). Since the trees were missing, average values (70%) were used for <br />condition contribution and placement with the exception of Tree 14. This tree had extensive decay In the <br />stump therefore the tree had no value. Table 1 presents species, stump height, stump diameter, estimated <br />DBH and estimated value for each of the significant canopy trees <br />The total area of canopy removed is estimated to be 14.450 ff. This estimate is based on the following <br />averaqe crown diameters: <br />American linden <br />Red oak <br />Sugar maple <br />50 feet <br />50 feet <br />40 feet <br />This area represents the union of crowns with the ? jove diameters centered over their stump locations. <br />The trees were located on a northeastern slope facing the lake. The steepest part of the slope represents <br />an 18 foot verticed change of grade and ranges from 27 percent to 60 percent from west to east. In a few <br />locations, equipment ruts were left during tree removal and the ruts have begun to erode. This slope also <br />creates issues of access and limits the type of equipment that may be used on site. In addition, the access <br />from the front yard to the back is only 10 feet wide. <br />Comments <br />1. It is my opinion that the circumstances of the unauthorized removal of trees dictates that the restoration <br />plan be consistent with the "Reasonable and Practical Replacement Cost" method of plant appraisal <br />(Council of Landscape Appraisers 1992). This method establishes the appraised damages are the <br />'cost to replace the number, size and species of trees destroyed to the extent that; 1) replacement <br />serves to substantially restore the character and quality of the property and 2) the cost of <br />replace.Tient is not greatly disproportionate to the resulting restoration.. <br />2. It is not reasonable or practical to transplant large trees as part of this restoration. The alternative is to <br />establish a approximate time franne for the restoration and to plant trees that with anticipated growth <br />will largely restore the quality and character of the site within that established time frame. A reasonable <br />time frame is 20 to 25 years. <br />3. With growth, 2 0 inch caliper trees planted on average with a 25 foot spacing would reach crown <br />closure in this restoration time franrie. Twenty-nine trees planted at this 25 foot spacing would be <br />requires to completely replace the 14,450 ft’ of canopy removed <br />4. The kinds of trees planted should be consistent with the those that were removed (i.e. largely sugar <br />maple and American linden with a few red oaks mixed in) These trees are readily available in 2 0 inch <br />caliper
The URL can be used to link to this page
Your browser does not support the video tag.