Laserfiche WebLink
completion of the work. The City shall use the nylon protective washers furnished by the Council under <br />the City’s own metal washers used in mounting the bus stop signs. The City shall install the protective <br />nylon washers directly against the reflective sheeting of the front face of t>ie bus stop signs. The City <br />shall be responsible for recycling existing Circle-T Signs removed under this agreement <br />3.05 Holder Installation. In installing Holders, the City shall use either Council-fiunished <br />safety, tamper-proof hardware, or tamper-proof hardware selected by and acquired at the City’s own <br />expense. The City shall install Holders in a manner so as to maximize pedestrian safety and minimize <br />vulnerability to vandalism. The City shall perform the installation of each Holder by (1) removing the <br />top (or bottom) end cap and glass window, (2) mounting the Holder to the sign-mounting structure <br />approximately 5 feet, 10 inches (70 inches) from grade to the top of the Holder, and (3) replacing the <br />glass window and refastening the top (or bottom) end cap to the Holder body. <br />The City shall mount the Holder as labeled: “INSTALL HOLDER THIS END UP” to help insure that <br />the bottom end cap (with its pre-fitted neoprene setting blocks for receiving the glass window) is at the <br />bottom of the installed Holder. The Council shall be responsible for the installation of its own <br />informational inserts in the Holder. <br />IV. COMPENSATION FOR CAPITAL IMPROVEMENT PROJECT <br />4.01 Initial Worksheet and Proposal Sheet. The Council has prepared an initial Worksheet <br />and an initial Proposal Sheet for the City’s work related to Capital Improvement Project Number 3291. <br />The initial Worksheet and the initial Proposal Sheet are attached to and incorporated in this agreement as <br />Exhibit B and Exhibit C, respectively. The initial Worksheet and the initial Proposal Sheet display initial <br />database quantities, application factors, projected quantities, and proposed compensation for the work to <br />be performed. <br />4.02 Payment The Council shall reimburse the City based on unit prices per task multiplied <br />by quantities of tasks performed. <br />4.03 Compensation. The Council ’s estimate of reimbursement to the City is shown tu the <br />initial Proposal Sheet (Exhibit C). <br />a. Quantities entered on Exhibit C are from March 1995 or a more current update of the <br />Council ’s Allstops database. <br />b.Unit costs entered on Exhibit C are the Council ’s estimate of fair and equitable <br />compensation for the work to be performed. <br />4.04 Invoice Requirements. Progress payments and cumulative total compensation to the <br />City shall be in accordance with an approved Cost Tabulation Sheet in the format in Exhibit D attached <br />to and incorporated in this agreement. The Cost Tabulation Sheet shall be completed by the City and <br />submitte ’ to the Council for payment as follows: <br />a. <br />b. <br />Quantities entered on the Cost Tabulation Sheet shall be invoice quantities of actual <br />work performed. <br />Quantities entered on the Cost Tabulation Sheet shall not exceed quantities shown on <br />Exhibit C unless so amended by prior written notification and mutual acceptance by <br />authorized representatives of the Council and the City. <br />-3-