My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-13-1999 Council Packet
Orono
>
City Council
>
1999
>
09-13-1999 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2023 4:07:39 PM
Creation date
4/13/2023 4:04:26 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR COUNCIL ACTION <br />^^UNcii MEETING <br />15 m9 <br />DATE: <br />ITEM NO <br />// <br />Department Approval: <br />Name Gregory A. Gappa <br />Title Director of Public Services <br />Administrator Reviewed: Agenda Section: <br />Engineer's Report <br />Item Description: Traffic Signal Justification Report for County Road 15/51 Intersection <br />Bonestroo Engineers recently completed a traffic study for the County Road 15 corridor in eastern <br />Orono. This study has been discussed by the Council at a work session meeting. One of the <br />recommendations of this study was to further investigate the installation of a traffic signal at the <br />County Road 15/51 intersection to provide for safer access onto County Road 15 from County <br />Road 51. This is especially important during the morning rush hour when it is difficult to make <br />a left mm onto County 15 because of the heavy eastbound traffic. Preliminary traffic counts <br />showed this intersection most likely will meet the required warrants for the installation of a traffic <br />signal. Per Minnesota State Starnes detailed traffic counts must be completed and a signal <br />justification report completed before a traffic signal can be installed. Twelve to sixteen hours of <br />traffic counts must be completed. <br />We have obtained a pronosal from Bonestroo Engineers for completion of a signal Justification <br />report for this project. The estimated cost for this smdy is $2,200. After completion, this smdy <br />will be submitted to Hennepin County for review and approval. If signal warrants are met, <br />additional discussions with the County will be required to discuss a project schedule and funding <br />options. We are recommending Council acceptance of this proposal. <br />COUNCIL ACTION REQUESTED: <br />Motion to accept proposal from Bonestroo Engineers for preparation of a Traffic Signal <br />Justification Report for the County Road 15/51 intersection at an estimated cost of $2,200. <br />2
The URL can be used to link to this page
Your browser does not support the video tag.