My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-13-1999 Council Packet
Orono
>
City Council
>
1999
>
09-13-1999 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2023 4:07:39 PM
Creation date
4/13/2023 4:04:26 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SEP-03-1999 09:57 MlhttEHAHA CREEK IJATEPSHED 6124710332 =. 02.06 <br />MCWD PERMIT APPLICATION: 99-169 REPORT DATE: <br />Applicant: Peter Andrea Co,Repre.senfative: Coffin & Gronbere <br />7700 Equitable Dr. #203 482 Tamarack Ave. <br />l^den Pfairic. MN 55344 Long Lake, MN 55356 <br />Location: 555 Stubbs Bav Rd.. Orono Subwatershed: U-10 <br />PID: 32-118-23 SubSubwatershed: <br />Annlicnhle Rules: Rule B. Erosion Control Rule N, Stormwater Manaecruent <br />Rule D. Wetland Protection <br />Exhibits Received: Site clans Runoff calculations <br />Preliminarv citv apDroval <br />Applicarion Received: Auuusl 5. 1999 Application Complete: August 27. 1999 <br />Kotiein^ Requirements: Mailed to residents w7in 600 ’ of project on: August 30.1999 <br />Wetland Conservation Act Notice mailed on: __ <br />Reviewed by: Andrevv SjTcrson, Jim Hafner <br />Project Review’ Status by Other Governnieiitfll Units: <br />DNR General Permit: <br />Rc\iew & Summary: This project proposes 7 family residential units on about 45 acres in <br />the City of Orono. An access road ending in a cul de sac will be constructed. Water qudit>- criteria <br />for the site will be met partially through a wet retention pond sized for the total hard surface of the <br />site and constructed to meet NURP standards. The pond v\ill pick up drainage from about 85 to <br />90% of tlic road and runoff IVom the front yards and driveways of four of the houses. The rrrrainder <br />of the road drains in the opposite direction from the pond and a rain garden is proposed to provide <br />treatment in addition to the grassv’ area over which the runoff will drain. Rale control is net for the <br />development, A pond maintenance agreement has been provided. No phosphorous fcrti.izers will <br />be used on the site and will be a condition of the restrictive covenants. <br />Wetlands are present on the site but the proposed development will not impact any of them. The <br />required wetland biitfcrs are provided and are called out on the site plans. <br />Appropriate erosion control measures will be implemented as detailed on the site plans. <br />Recommendations: Approve
The URL can be used to link to this page
Your browser does not support the video tag.