Laserfiche WebLink
CITY OF ORONO <br />PETER ANDREA SUBDIVISION <br />RESIDENTIAL SITE DEVELOPMENT <br />PLAT FILE NO. 2479 <br />SITE IMPROVEMENT COST ESTIMATE <br />ITEM UNIT <br />EST. UNIT <br />QUANTITY PRICE <br />EST. <br />COST <br />Mobilization LS 1 $5,000.00 $5,000 <br />Site grading, demolition and removal LS 1 20,000.00 20,000 <br />Common Excavation CY 1500 6.00 9,000 <br />Aggregate base. Cl. 5,100% crushed TN 2200 12.00 26,400 <br />Geotextile fabric SY 4500 1.00 4,500 <br />Type 41 bit. wear course TN 900 36.00 32,400 <br />Bituminous tack GL 300 2.00 600 <br />Pond excavation LS 1 5,000.00 5,000 <br />RCP storm sewer LF 100 30.00 3,000 <br />RCP apron w/trashguard EA 3 600.00 1,800 <br />Outlet control structure EA 1 2,000.00 2,0Cw <br />Rip rap. Cl. 3 CY 20 50.00 1,000 <br />Silt fence LF 1500 3.00 4,500 <br />Seeding with 4” topsoil AC 4.3 1.500.00 <br />6,450 <br />Estimated Construction Cost <br />+50% Security Deposit <br />Total Security Deposit Required <br />2479PETER ANDREA.xls <br />$121,650 <br />60.825 <br />$182,475