My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-12-1999 Council Packet
Orono
>
City Council
>
1999
>
07-12-1999 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2023 3:42:31 PM
Creation date
4/12/2023 3:37:56 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
246
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
07/06/99 11:27 FAX 612 337 5601 DSU, INC.@005 <br />Havane Town Square Park & Municipal Parking Area July 6. 1999 <br />c. We will attend a pre-constnictlon meeting. <br />Task 203 - Construction Admmistration/Observation <br />a. We will assist the City of Orono in securing neccssaiy permits and monitoring/administering permit <br />requirements MPCA erosion control monitoring). <br />b. We will serve as project coordinator between tlie General Contractor and tlie City. <br />c. Construction observarion will be provided. Construction observation will include periodic site visits <br />(once per week or as requested during critical stages) with City Staff attending. <br />d. Contract administration will be provided. ThU will include review and approval of shop <Jrawings, <br />review and certification of payment requests, preparation of change orders, issuance of field <br />directives and minor changes, preparation of punch lists and final inspection. <br />ESTIMATED COSTS <br />BASIC SF.RVTCES <br />The following is a summaiy of our estimated costs for the requested basic services. We have also included an <br />estimated percentage fee range for the implementation phase and a list of optional additional services. <br />PHASP. ONF. - SCHEMATIC DESIGN <br />Ta.sk 101 Initial Meeting <br />A. Administration <br />B. Initial Meeting <br />Task 102 Project Start-Up/Data Gathering <br />A. Map and Document Review <br />B. Site Visit/Reconnaissance ' <br />Task 103 Site Analysis <br />A. Graphic Site Analysis <br />B. Issues Analysis <br />Task 104 Program Development/Confirmation <br />A. Analyze Proposed Program end Site Compatibility <br />Task 103 Schematic Design Concepts <br />A. Schematic Concepts (2) <br />B. Preliminary Cost Estimates <br />Eaik parking Area <br />?450tt <br />DAHLGREtt. SHARDLOW. AND UBAN. INC.tag**
The URL can be used to link to this page
Your browser does not support the video tag.